31m @ 1.29g/t Au Confirms Continuity at London-Victoria
Released
Released
Announcement PDF
\
www.adavaleresources.com
Adavale Resources Limited
Level 2, 49 Oxford Close
West Leederville, WA, 6007
Directors & Officers
ALLAN RITCHIE
Executive Chairman & CEO
DAVID WARD
Managing Director
NIC MATICH
Non-Executive Director
LEONARD MATH
CFO & Company Secretary
ASX: ADD
Adavaleresources
Adavale_ASXADD
Investor@adavaleresources.com
+61 2 9127 9852
ASX ANNOUNCEMENT
06 August 2026
CONSISTENT WIDE GOLD INTERCEPTS EXTEND
ACROSS 1.5KM AT LONDON-VICTORIA
Assays from a further 11 RC holes (2,390m) continue to demonstrate the continuity of
gold mineralisation below the existing 1.5km-long open pit at London-Victoria, adding
valuable drill density ahead of the planned Mineral Resource update this quarter.
Highlighted intercepts span across 700m of the 1.5km open pit strike.
Highlights include:
• 31m @ 1.29g/t Au from 133m (ALRC070)
ALRC070 intercept is ~16m below the pit floor, highlighting the potential for
near term production
• 30m @ 0.80g/t Au from 137m including 7m @ 1.46g/t Au from 158m (ALRC060)
• 5m @ 1.99g/t Au from 180m including 3m @ 2.92g/t AU from 181m (ALRC062)
• 3m @ 3.52g/t Au from 144m (ALRC068)
• 44m @ 0.62g/t Au from 128m including 5m @ 1.02g/t from 128m (ALRC061)
Drilling is continuing; assays for a further 10 drillholes are currently being processed
and are expected to be released in the coming weeks.
Adavale Resources Managing Director, Mr. David Ward, commented:
“These latest results reinforce what the systematic drillout is showing us, gold mineralisation is
consistently developed below the London-Victoria pit across multiple sections. ALRC070’s 31-metre
intercept at 1.29 grams per tonne, commencing just 16m below the pit floor, is a strong result in its own
right, while the broad intervals in ALRC060 and ALRC061 demonstrate the continuity and scale of the
mineralised package.
Importantly, this is not dependent on a single standout hole. The repeated intersections across the whole
1.5km strike of the open pit are increasing drill density and strengthening our geological interpretation
ahead of the planned Mineral Resource update. London-Victoria continues to demonstrate the attributes
of a substantial brownfields gold system, providing a clear foundation for further growth.”
2
Adavale Resources Limited (ASX:ADD) (“Adavale” or the “Company”), an Australian junior
explorer/developer focused on gold and copper in the Lachlan Fold Belt of New South Wales, is
pleased to report assays from a further 11 reverse circulation holes (2,390m) completed as part of
the ongoing resource drillout at the London-Victoria Gold Mine.
Figure 1: Plan View of the London Victoria Open Pit displaying all Adavale Drillholes to date (projected to
surface) coloured with calculated gold intervals >1m wide over 0.3g/t Au projected to surface.
Blue traces = assays pending
3
Figure 2: Cross Section Displaying position and gold results for ALRC070 and ALRC071 (assays pending)
relative to the historic London-Victoria Open Pit (Section Line B-B’ displayed in Figure 1)
Note – The intercept 31m @ 1.29g/t Au in ALRC070 is only 16m below the pit floor highlighting the potential
for near term production from this area
Assay results have now been received for ALRC060 to ALRC070, comprising 11 RC holes for a
total of 2,394m. These holes form the next batch from Adavale’s systematic resource drillout
beneath the 1.5km-long London-Victoria open pit.
Most holes returned reportable gold mineralisation, including broad intersections in
ALRC060, ALRC061 and ALRC070. The results occur across six drill sections spanning
approximately 700m of northing and add drill density through the northern, central and
southern parts of the deposit.
The broad intersection of 31m @ 1.29g/t Au in ALRC070 is particularly significant due to its shallow
position immediately beneath the existing London–Victoria open pit. This mineralisation could
potentially be accessed early in a future pit cutback and provide an important source of initial plant
feed during the establishment of mining operations.
The broad intervals in ALRC060, ALRC061 and ALRC070, together with narrower higher-grade
intervals in ALRC062 and ALRC068, support the interpretation of a persistent, mineralised
package along the line of the open-pit and containing locally higher-grade positions. The
recurrence of mineralisation on several spaced sections is the basis for the Company’s continuity
interpretation; it is not dependent on any single high-grade result.
4
The additional drilling is increasing data density below the open pit which will be incorporated
into the geological model and add to the planned Mineral Resource update this quarter. Drilling
remains active, with additional assay results to be reported following receipt, validation and
interpretation.
Figure 3: Cross Section Displaying position and gold results for ALRC060 and ALRC061 relative to the
historic London-Victoria Open Pit (Section Line A-A’ displayed in Figure 1)
ALRC061 interval 44m @ 0.62g/t Au is calculated with 0.3g/t cut-off and 4m internal dilution
The mineralisation exhibits plunging geometries within the shear zone and along strike, meaning
the apparent position and depth on section vary progressively between adjacent cross-sections.
As a result, wide mineralised zones may appear to narrow on one section before reappearing on
the next, rather than maintaining a constant plane on the section. When the drilling is considered
in three dimensions, the intersections define coherent plunging trends that supports the continuity
of the mineralised system beneath and along strike of the shear zone.
5
London-Victoria Gold Mine – Next Steps
• Brownfields drilling
o Systematic “drill out” underway to expand and upgrade existing mineralisation and
support ongoing Mineral Resource growth.
o Active drilling on site, with assay results reported once received and validated.
• Metallurgical testing
o Comprehensive metallurgical test work on core samples to assess recoveries and
support future development studies.
• Preliminary scoping studies
o Early-stage technical and economic assessments to evaluate development pathways
and inform project prioritisation.
• Geophysical surveys
o High-resolution airborne geophysics to refine structural interpretation, improve
targeting accuracy and prioritise follow-up drilling.
• MRE Update
o Expect to complete an update to the MRE by mid-3Q CY26
Calarie Gold Mining Licence (ML739) – Next Steps
• Magnetic Survey: In the light of the positive magnetics vs gold association at London-
Victoria airborne and/or ground-based magnetics will be assessed as a potential tool to
assist with targeting.
• Detailed Review and Interpretation to refine follow-up drill targets.
• RC and/or Diamond Drilling: Post detailed review and interpretation follow-up drilling of
high-grade drill results by OMX at the Calarie Gold Mine.
Greenfields Exploration – Regional Targets at Belt-Scale Parkes Project -Next Steps
• Geophysical surveys
o Extension of high-resolution magnetics at Ashes, into the newly acquired exploration
tenure to assist target generation associated with the IP anomalism and high-grade
surface sampling.
• Surface geochemistry
o Extension of systematic soil and rock-chip programs at Ashes, into the newly
acquired exploration tenure to generate new anomalies and rank targets for drilling.
• First-pass drilling
o Initial drill testing of priority greenfield targets generated from geophysics and
geochemistry to pursue new discoveries.
6
This announcement is authorised for release by the Board of Adavale Resources Limited.
Further information:
Allan Ritchie
Executive Chairman and CEO
Adavale Resources
E: investor@adavaleresources.com
P: +61 2 9127 9852
David Ward
Managing Director
Adavale Resources
E: investor@adavaleresources.com
P: +61 2 9127 9852
7
Forward Looking Statements
Certain statements in this announcement are or may be “forward-looking statements” and
represent Adavale’s intentions, projections, expectations, or beliefs concerning among other
things, future exploration activities. The projections, estimates and beliefs contained in such
forward-looking statements involve known and unknown risks, uncertainties, and other factors,
many of which are beyond the control of Adavale Resources, and which may cause Adavale
Resources actual performance in future periods to differ materially from any express or implied
estimates or projections. Nothing in this announcement is a promise or representation as to the
future. Statements or assumptions in this announcement as to future matters may prove to be
incorrect and differences may be material. Adavale Resources does not make any representation
or warranty as to the accuracy of such statements or assumptions.
ASX Announcement References
• 5 May 2025 “Maiden JORC Resource at London-Victoria Project”
The Company confirms that it is not aware of any new information or data that materially affects
the information included in the original market announcements. The Company confirms that the
form and context in which the Competent Person’s findings are presented have not been materially
modified from the original market announcement.
Information on the Mineral Resources presented on the London-Victoria deposit is contained in
the ASX announcement dated 5 May 2025. Where the Company refers to Mineral Resource in this
presentation, it confirms that it is not aware of any new information or data that materially affects
the information included in that announcement and all material assumptions and technical
parameters underpinning the Mineral Resource estimate with that announcement continue to
apply and have not materially changed. The Company confirms that the form and context in which
the Competent Person’s findings are presented have not materially changed from the original
announcement.
Information on the Mineral Resources presented on the Calarie’s gold deposit is contained in the
ASX announcement dated 1 June 2026. Where the Company refers to Mineral Resource in this
presentation, it confirms that it is not aware of any new information or data that materially affects
the information included in that announcement and all material assumptions and technical
parameters underpinning the Mineral Resource estimate with that announcement continue to
apply and have not materially changed. The Company confirms that the form and context their
with JORC Table 1 in which the Competent Person’s findings are presented have not materially
changed from the original announcement.
Competent Persons Statement
The information in this document that relates to exploration results is based on information
compiled by David Ward BSc, a Competent Person who is a Member of the Australasian Institute
of Mining and Metallurgy (AUSIMM), (Member 228604). David Ward has over 25 years of experience
in metallic minerals mining, exploration and development and has sufficient experience that is
relevant to the style of mineralisation and type of deposit under consideration and to the activities
being undertaken to qualify as a ‘Competent Person’ as defined under the 2012 Edition of the
‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr
Ward consents to the inclusion in this report of the matters based on his information in the form
and context in which it appears.
8
Overview of The Parkes Project: A World-Class Geological Setting
The Project resource is 166koz Au and comprises the Calarie Mining Licence, London Victoria
Mine as well as an additional 10 granted exploration licences (EL’s) that cover a total area of
~610 km2 across 70km of contiguous Belt-Scale strike strategically located within the Macquarie
Arc of NSW’s Lachlan Fold Belt – a Tier-1 mining jurisdiction. The region hosts world-class
operations such as Cadia Ridgeway (35.1Moz Au & 7.9Mt Cu) and Northparkes (5.2Moz Au &
4.4Mt Cu), adjacent and directly west of the Parkes Project.
Figure 5: Map of the central New South Wales Lachlan Fold Belt
9
ABOUT ADAVALE RESOURCES
Gold and Copper explorer-developer focused on the Belt-Scale Parkes Project in NSW's Lachlan
Fold Belt.
The Belt-Scale Parkes Thrust Project
Adavale Resources Limited (ASX:ADD)
tenements span ~610km2
including the
Calarie Mining Licence and the London
Victoria Mine with a combined historical
resource of 166koz Au as well as an
additional 10 licences, with all licences
spanning 70km of contiguous strike, that
are highly prospective for Au-Cu. Located
adjacent to ASX:EVN’s giant Northparkes
(5.2Moz Au & 4.4Mt Cu) copper-gold
porphyry and along the Parkes Thrust
Hosted orogenic deposits including our
London-Victoria, Calarie and ASX:ALK’s
Tomingley and Peak Hill deposits. The
project area encompass’ the highly
prospective Ordovician-aged rocks of the
Macquarie Arc which includes ASX:NEM
massive Cadia-Ridgeway (35Moz Au & 7.9Mt
Cu) copper-gold porphyry.
The Kabanga Jirani Nickel Project
Adavale also holds the Kabanga Jirani Nickel
Project, a portfolio of 11 highly prospective
granted licences along the East African Nickel
belt in Tanzania. The nine southernmost
licences are proximal to the world class
Kabanga Nickel Deposit (87.6Mt @ 2.63% Ni
Eq). Adavale holds 100% of all licences except
for two licences that are known as the
Luhuma-Farm-in, which are held at 65%,
adding a further 99km2
and bringing the
portfolio to 1,000km2
. Adavale’s licences
were selected based on their strong
geochemical and geophysical signatures
from the previous exploration undertaken by
BHP.
10
Appendix 1 – Collar Summary (Entire Program)
HOLE_ID X (GDA94) Y (GDA94) RL DEPTH Dip
Azimuth
(GDA94)
Status
ALRC027 605301 6329991 333.5 201 -51 280 Announced 24 June 2026
ALRC028 605302 6329991 333.5 231 -60 275 Announced 30 April 2026
ALRC029 605288 6329922 333.3 231 -51 276 Announced 24 June 2026
ALRC030 605289 6329922 333.3 231 -60 276 Announced 24 June 2026
ALRC031 605274 6329878 333 213 -50 280 Announced 30 April 2026
ALRC032 605275 6329878 333 231 -60 280 Announced 30 April 2026
ALRC033 605243 6329809 333.2 201 -49 297 Announced 30 April 2026
ALRC034 604978 6329216 323.8 231 -70 279 Announced 30 April 2026
ALRC035 604969 6329191 323.9 231 -69 283 Announced 30 April 2026
ALRC036 604966 6329160 322.6 201 -60 280 Announced 24 June 2026
ALRC037 605231 6329791 333.2 201 -50 278 Announced 24 June 2026
ALRC038 605232 6329791 333.2 231 -60 280 Announced 24 June 2026
ALRC039 605203 6329744 334.2 201 -51 278 Announced 24 June 2026
ALRC040 605204 6329744 334.2 183 -60 276 Announced 24 June 2026
ALRC041 605185 6329698 335.3 201 -50 278 Announced 24 June 2026
ALRC042 605186 6329698 335.3 234 -60 279 Announced 7 July 2026
ALRC043 605171 6329650 336.4 198 -48 280 Announced 7 July 2026
ALRC044 605172 6329650 336.4 234 -60 279 Announced 7 July 2026
ALRC045 605158 6329601 336.9 204 -50 277 Announced 7 July 2026
ALRC046 605159 6329601 336.9 234 -60 276 Announced 7 July 2026
ALRC047 605146 6329557 337 162 -48 278 Announced 7 July 2026
ALRC048 605147 6329557 337 234 -60 278 Announced 7 July 2026
ALRC049 605106 6329511 335.6 210 -60 277 Announced 7 July 2026
ALRC050 605107 6329512 335.6 234 -70 276 Announced 7 July 2026
ALRC051 605087 6329462 335.6 204 -55 274 Announced 7 July 2026
ALRC052 605087 6329462 335.6 227 -66 273 Announced 7 July 2026
ALRC053 605086 6329411 329.5 71 -50 278 Announced 7 July 2026
ALRC054 605087 6329411 329.5 204 -60 280 Announced 7 July 2026
ALRC055 605087 6329411 329.4 210 -70 279 Announced 7 July 2026
ALRC056 605079 6329348 327.8 210 -55 276 Announced 24 June 2026
ALRC057 605080 6329348 327.8 222 -65 277 Announced 24 June 2026
ALRC058 605048 6329304 326 204 -50 276 Announced 24 June 2026
ALRC059 605049 6329304 326.1 234 -60 276 Announced 24 June 2026
ALRC060 605021 6329262 324.9 204 -50 280 This Announcement
ALRC061 605022 6329262 324.8 234 -60 279 This Announcement
ALRC062 605296 6329957 331 204 -50 279 This Announcement
ALRC063 605297 6329957 331 234 -60 280 This Announcement
ALRC064 605195 6329721 332 204 -50 275 This Announcement
ALRC065 605196 6329721 332 234 -59 274 This Announcement
ALRC066 605216 6329769 332 204 -49 277 This Announcement
ALRC067 605217 6329769 331 234 -59 277 This Announcement
ALRC068 605179 6329674 333 204 -49 274 This Announcement
ALRC069 605180 6329674 333 234 -60 274 This Announcement
ALRC070 605084 6329436 330.5 204 -55 277 This Announcement
ALRC071 605085 6329436 330.5 234 -64 277 Assays Pending
ALRC072 605089 6329388 329 204 -55 277 Assays Pending
ALRC073 605090 6329388 329 234 -64 277 Assays Pending
ALRC074 604999 6329243 324 204 -53 276 Assays Pending
ALRC075 605000 6329243 324 234 -64 278 Assays Pending
ALRC076 605035 6329286 326 204 -55 280 Assays Pending
ALRC077 605036 6329286 326 234 -64 276 Assays Pending
ALRC078 605063 6329327 327 204 -54 274 Assays Pending
ALRC079 605064 6329327 327 234 -64 273 Assays Pending
ALRC080 604643 6328978 317 360 -48 101 Assays Pending
ALD001 604978 6329155 322 280 -62 272 Assays Pending
ALD002 604983 6329214 321 246 -50 282 Assays Pending
ALD003 604968 6329115 321 351 -51 234 Assays Pending
11
Appendix 2 – Significant Intercepts
(Significant intercepts for all 14 holes, calculated cut-off grades are shown (0.3g/t, 0.5g/t, 1.0g/t Au). Showing intercepts
greater than or equal to 2m with 3m internal dilution)
Hole_ID
Depth from
(m) Width (m) Au g/t GM
Cut-Off Au
g/t
ALRC060 104 6 0.58 3 0.3
ALRC060 123 3 0.51 2 0.3
ALRC060 130 2 0.8 2 0.5
ALRC060 137 30 0.8 24 0.3
including 139 28 0.83 23 0.5
including 143 5 0.87 4 1
and 158 7 1.46 10 1
ALRC061 106 10 0.56 6 0.3
including 107 9 0.59 5 0.5
ALRC061 128 19 0.61 12 0.3
including 128 5 1.02 5 0.5
including 129 2 1.33 3 1
ALRC061 138 4 0.9 4 0.5
ALRC061 151 21 0.72 15 0.3
including 152 20 0.74 15 0.5
including 167 4 0.87 3 1
ALRC062 180 5 1.99 10 0.3
including 181 4 2.38 10 0.5
including 181 3 2.92 9 1
ALRC063 219 3 0.89 3 0.3
including 219 2 1.18 2 0.5
ALRC065 144 7 0.33 2 0.3
ALRC066 143 7 1.03 7 0.3
including 144 3 1.75 5 1
ALRC067 156 2 0.62 1 0.3
ALRC068 132 7 0.38 3 0.3
ALRC068 144 7 1.7 12 0.3
including 144 3 3.52 11 1
ALRC069 151 4 0.48 2 0.3
ALRC070 105 15 0.39 6 0.3
including 112 2 1.13 2 1
ALRC070 133 31 1.29 40 0.3
including 133 14 1.74 24 1
and 151 13 1.12 15 0.5
including 151 11 1.21 13 1
12
Appendix 3 – JORC Code, 2012 Edition – Table 1
Section 1 Sampling Techniques and Data
(Criteria listed in the preceding section also apply to this section)
CRITERIA JORC Code Explanation Commentary
SAMPLING
TECHNIQUES
• Nature and quality of sampling (e.g. cut channels,
random chips, or specific specialised industry standard
measurement tools appropriate to the minerals under
investigation, such as down hole gamma sondes, or
handheld XRF instruments, etc). These examples should
not be taken as limiting the broad meaning of sampling.
• Include reference to measures taken to ensure sample
representivity and the appropriate calibration of any
measurement tools or systems used.
• Aspects of the determination of mineralisation that are
Material to the Public Report.
• In cases where ‘industry standard’ work has been done
this would be relatively simple (e.g. ‘reverse circulation
drilling was used to obtain 1 m samples from which 3 kg
was pulverised to produce a 30 g charge for fire assay’).
In other cases more explanation may be required, such
as where there is coarse gold that has inherent sampling
problems. Unusual commodities or mineralisation types
(e.g. submarine nodules) may warrant disclosure of
detailed information.
• The quality of reverse circulation (RC) percussion drilling is generally medium–high because the
method significantly reduces the potential of contamination, unless there is a lot of groundwater
or badly broken ground. Consequently, these samples can be representative of the interval
drilled and therefore can be used for Mineral Resource estimation.
• RC drilling was used to obtain 1m samples collected through a rig mounted cyclone and then
using a rig mounted cone splitter to produce an approximately 3kg sample split for assay.
• The samples were then dispatched to the Onsite Laboratory Services laboratory in Bendigo. The
samples were then crushed and pulverised to produce a 25g charge for fire assay with an AAS
(atomic absorption spectroscopy) finish for gold determination, with a 0.01ppm detection limit.
• Drill chips were logged by a trained geologist.
• Duplicate samples were collected approximately every 20 samples and submitted to the
laboratory. Duplicates intervals were selected within zones of visual mineralisation by the onsite
geologist.
DRILLING
TECHNIQUES
• Drill type (e.g. core, reverse circulation, open-hole
hammer, rotary air blast, auger, Bangka, sonic, etc) and
details (e.g. core diameter, triple or standard tube, depth
of diamond tails, face-sampling bit or other type,
whether core is oriented and if so, by what method, etc).
• RC drilling was completed using a 140mm face sampling bit and hammer.
DRILL SAMPLE
RECOVERY
• Method of recording and assessing core and chip sample
recoveries and results assessed.
• Measures taken to maximise sample recovery and
ensure representative nature of the samples.
• Whether a relationship exists between sample recovery
and grade and whether sample bias may have occurred
due to preferential loss/gain of fine/coarse material.
• All samples were dry and RC drilling recoveries recorded.
• Sample recoveries were considered to be good and within acceptable tolerance for RC drilling.
13
CRITERIA JORC Code Explanation Commentary
LOGGING
• Whether core and chip samples have been geologically
and geotechnically logged to a level of detail to support
appropriate Mineral Resource estimation, mining studies
and metallurgical studies.
• Whether logging is qualitative or quantitative in nature.
Core (or costean, channel, etc) photography.
• The total length and percentage of the relevant
intersections logged.
• Systematic geological logging was undertaken onsite at the time of RC drilling. Data includes:
• Collar information including hole depth, coordinates, survey method, survey type, survey date,
tenement number, tenement name, prospect name, hole status, date commenced drilling, date
completed drilling, pre-collar depth, water depth, bottom of complete oxidation, top of fresh
rock.
• Nature and extent of weathering.
• Nature and extent of lithologies.
• Interpretation of relationship between lithologies.
• Nature and extent of veining.
• Amount and mode of occurrences of ore minerals.
• Magnetic susceptibility measurements for every 1m sample.
• Both qualitative and quantitative data was collected.
• RC chips were retained in chip trays and stored at Adavale’s yard in Parkes.
• Chip trays were photographed.
SUB-SAMPLING
TECHNIQUES
AND SAMPLE
PREPARATION
• If core, whether cut or sawn and whether quarter, half or
all core taken.
• If non-core, whether riffled, tube sampled, rotary split,
etc and whether sampled wet or dry.
• For all sample types, the nature, quality, and
appropriateness of the sample preparation technique.
• Quality control procedures adopted for all sub-sampling
stages to maximise representivity of samples.
• Measures taken to ensure that the sampling is
representative of the in situ material collected, including
for instance results for field duplicate/second-half
sampling.
• Whether sample sizes are appropriate to the grain size
of the material being sampled.
• RC samples were collected using a rig mounted cone splitter.
• All of samples collected were dry.
• RC samples were dried, crushed, and pulverised to 90% passing 75 microns
• RC drilling field duplicates were taken approximately every 20 samples. The samples were dried,
crushed, and pulverised to 90% passing 75 microns.
QUALITY OF
ASSAY DATA AND
LABORATORY
TESTS
• The nature, quality and appropriateness of the assaying
and laboratory procedures used and whether the
technique is considered partial or total.
• For geophysical tools, spectrometers, handheld XRF
instruments, etc, the parameters used in determining
the analysis including instrument make and model,
reading times, calibrations factors applied and their
derivation, etc.
• Nature of quality control procedures adopted (e.g.
standards, blanks, duplicates, external laboratory
checks) and whether acceptable levels of accuracy (i.e.
lack of bias) and precision have been established.
• Gold (Au) was determined by 50g fire assay (method Au-PE01S) with a detection limit of 0.01ppm.
• Field duplicates were sampled using the same rig mounted cone splitter as the primary samples.
The results of the duplicates were within acceptable tolerance from original.
• Drill data is compiled and collated and reviewed by senior Adavale staff.
• No historic or current drillholes have been twinned.
• The strong foliation in the host rocks caused significant deviation in some drillholes as a result
some holes have intersected the mineralised horizon close to historic drillhole intersections. All
legacy and new drillholes are displayed on the cross-sections and long-sections within the
announcement.
14
CRITERIA JORC Code Explanation Commentary
VERIFICATION OF
SAMPLING AND
ASSAYING
• The verification of significant intersections by either
independent or alternative company personnel.
• The use of twinned holes.
• Documentation of primary data, data entry procedures,
data verification, data storage (physical and electronic)
protocols.
• Discuss any adjustment to assay data.
• Drill data is compiled and collated and reviewed by senior Adavale staff.
• No historic or current drillholes have been twinned.
• The strong foliation in the host rocks caused significant deviation in some drillholes as a result
some holes have intersected the mineralised horizon close to historic drillhole intersections. All
legacy and new drillholes are displayed on the cross-sections and long-sections within the
announcement.
LOCATION OF
DATA POINTS
• Accuracy and quality of surveys used to locate drill holes
(collar and down-hole surveys), trenches, mine workings
and other locations used in Mineral Resource estimation.
• Specification of the grid system used.
• Quality and adequacy of topographic control.
• Drill collar locations were initially pegged and surveyed using a handheld Garmin GPS with an
accuracy of 3-5m.
• Drillhole collar and downhole survey co-ordinates are recorded in UTM MGA94 Zone 55S.
• All angled RC holes were downhole surveyed using Reflex GYRO survey tool to produce azimuth
and dip readings. Readings were collected typically at a 5m spacing on open hole surveys post
completion of drilling the holes.
• Topography was determined via drone photogrammetry processed by Drone Deploy and cross
checked with the legacy open pit survey.
DATA SPACING
AND
DISTRIBUTION
• Data spacing for reporting of Exploration Results.
• Whether the data spacing and distribution is sufficient to
establish the degree of geological and grade continuity
appropriate for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications applied.
• Whether sample compositing has been applied.
• Drillhole collar spacing is variable but designed to intersect the mineralised body approximately
on 50m sections.
• The London-Victoria deposit has an existing 2012 JORC Inferred Mineral Resource Estimate of
3.8Mt @ 0.95g/t Au for 115koz Au at a reporting cut-off of 0.25 g/t Au and 3.14Mt @ 1.06 g/t Au
for 107koz at a 0.5g/t cut-off. (Adavale Resources Limited Announcement 5th May 2025).
• All 1m samples collected were assayed for Au and no sample compositing has been applied.
ORIENTATION OF
DATA IN
RELATION TO
GEOLOGICAL
STRUCTURE
• Whether the orientation of sampling achieves unbiased
sampling of possible structures and the extent to which
this is known, considering the deposit type.
• If the relationship between the drilling orientation and
the orientation of key mineralised structures is
considered to have introduced a sampling bias, this
should be assessed and reported if material.
• Drilling was mostly designed to intercept perpendicular to north-south oriented mineralised
shear zones.
• Drillhole deviations are considered mostly within tolerance for RC drilling in a strongly foliated
host rock.
SAMPLE
SECURITY
• The measures taken to ensure sample security.
• Drill chip sample bags were collected within green plastic sample bags and stored onsite during
the drilling program.
• The sample chain of custody has been managed by Adavale Resources Limited staff and a local
courier company who delivered the assay samples to the laboratory.
• On completion of the drilling program the samples were palletised, stored at Adavale’s yard in
the Parkes Industrial Estate. The samples were then dispatched by courier to the analytical
laboratory in Bendigo in two batches.
AUDITS OR
REVIEWS
• The results of any audits or reviews of sampling
techniques and data.
• Data collection and sampling techniques have not been reviewed or audited.
15
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section)
CRITERIA JORC Code explanation Commentary
MINERAL TENEMENT AND
LAND TENURE STATUS
• Type, reference name/number, location and ownership
including agreements or material issues with third parties
such as joint ventures, partnerships, overriding royalties,
native title interests, historical sites, wilderness or national
park and environmental settings.
• The security of the tenure held at the time of reporting
along with any known impediments to obtaining a licence
to operate in the area.
• The London-Victoria Gold Project is located on EL7242 situated 5km south-west of
Parkes in Central-West NSW.
• EL7242, EL8830, EL8831 and EL9711 are subject to a JV agreement between Adavale
and the tenements’ vendor, Agricultural Equity Investments Pty Ltd (“AEI”). Adavale
owns 72.5% of the tenements and is the operator of the JV with the remaining 27.5%
and a 2.5% net smelter royalty exists via the purchase agreement in 2025 held by AEI.
EXPLORATION DONE BY
OTHER PARTIES
• Acknowl
Share your feedback
Discover