Quarterly Activities and Cashflow Report
Released
Released
Announcement PDF
\
www.adavaleresources.com
Adavale Resources Limited
Level 2, 49 Oxford Close
West Leederville, WA, 6007
Directors & Officers
ALLAN RITCHIE
Executive Chairman & CEO
DAVID WARD
Non-Executive Director
NIC MATICH
Non-Executive Director
LEONARD MATH
CFO & Company Secretary
ASX: ADD
Adavaleresources
AdavaleL
Investors@adavaleresources.com
+61 2 8003 6733
ASX ANNOUNCEMENT
31 October 2025
Quarterly Activities Report
For the quarter ended 30th
September 2025
Highlights
• Maiden 14-hole, 2,060 m RC drilling campaign completed at London Victoria Gold
Mine, delivering multiple significant grade gold intercepts including:
o ALRC001: 10m @ 1.95g/t Au from 149m, which ended intersecting mineralisation just
below the mined pit.
o ALRC014: 48m @ 0.82g/t Au from 133m (including a higher-grade interval of 25m @
1.17g/t Au from 144m), extending mineralisation ~100m below the pit floor & outside
the current JORC Mineral Resource Estimate of 3.14Mt @ 1.06 g/t Au for 107koz.
o ALRC011: 3m @ 6.64g/t Au from 10m, intersecting high-grade shallow gold south of
the previously mined pit.
o Multiple other encouraging drill results including: 4m @ 0.9g/t Au from 1m and 12m
@ 1.48g/t Au, 6m @ 1.69g/t Au, 9m @ 0.91g/t Au from 4m, 8m @ 0.71g/t Au, 3m @ 1.92g/t
Au from 9m, 5m @ 0.63g/t Au from 61m, 7m @ 0.38g/t Au from 209m.
• Ground magnetics survey completed at the wider Ashes–Myalls prospect area
and an IP survey completed at Ashes, refining future drill targets, with rock-chip
sampling across several Parkes prospects identifying gold & copper
prospectivity.
• ~$3.1 million of funding secured, with a new cornerstone ‘Gleneden’ taking a 20%
stake in the company, $152,000 participation from directors and $588,000 from
a new escrowed strategic investor group.
• Post-quarter:
o Transformational appointment of NED David Ward to Managing Director
o 100% Native Title Consent for the Marree Uranium Project, providing
Adavale a pathway to maximise investor & stakeholder value.
• Adavale is well-funded to execute on second-phase drilling in Q4 CY2025 across
London Victoria Mine & highly prospective greenfield targets including Ashes &
Myalls.
Adavale Resources Executive Chairman and CEO, Mr. Allan Ritchie, commented:
“This has been a transformative quarter of growth for Adavale. Our maiden drilling campaign at London
Victoria, the first conducted in 28 years has delivered outstanding results. We have confirmed extensions
of gold mineralisation more than 100 metres below the pit floor and well outside the current Mineral
Resource Estimate. The success of this program underscores the strength of our technical team and the
exceptional prospectivity of our Parkes Gold and Copper Project, located within the Lachlan Fold Belt,
one of Australia’s premier mineral provinces.
2
With over $3 million raised during the quarter, we now enter the next phase ready to advance second-
phase drilling across London Victoria and the exciting pipeline of greenfields targets emerging from our
expanded exploration dataset. The momentum built this quarter firmly establishes Parkes as a
cornerstone asset capable of driving significant value growth for our shareholders, and I look forward to
reporting further on the productive quarter ahead.”
Adavale Resources Limited (ASX:ADD) (“Adavale” or the “Company”), is pleased to report on
its activities for the quarter ended 30 September 2025 (the “Quarter”).
Parkes Gold and Copper Project – Lachlan Fold Belt, NSW
London Victoria Gold Mine
On 1 July 2025, Adavale announced that the local RC drilling contractor DRILLIT (Figure 1)
was mobilised to London Victoria Mine to commence their maiden 10-hole, 2,200m RC
drilling program. Adavale’s initial 10-hole drilling program was aimed at targeting shallow
extensions to the known mineralisation (Figure 2). The primary objective of the program
was to increase the JORC Inferred Mineral Resource Estimate (MRE) of 3.14Mt @ 1.06 g/t
Au for 107koz, with the secondary objective of testing for the presence of perpendicular
dilation veins similar to that found at the newly granted high-grade historical Koh-I-Nor
mine, located 2.7km to the east, which was mined at gold grades up to 43.8g/t Au.
Figure 1: DRILLIT UDR 650 prior to mobilisation to London Victoria Mine
3
Figure 2: Long section of London Victoria Mine
On 16 July 2025, Adavale announced that the maiden RC drilling program at the London
Victoria Mine was progressing well and ahead of schedule, with 9 holes completed for a
total of 996m drilled. All holes drilled had intersected the target variably quartz veined
mineralised shear zone as identified from initial logging by Adavale. This was well
correlated from consideration of historical drilling and current geological interpretation. In
addition, Adavale also made the decision to expand the program to 14 holes from the
originally planned 10.
Figure 3 (Left): DRILLIT UDR 650 operating. Figure 4 (Right): Quartz-carbonate veining within the open pit.
On 4 August 2025, Adavale announced that the maiden RC drilling program at the London Victoria
Mine had been completed. A total of 14 RC holes for 2,060m were drilled successfully intersecting
the targeted shear zone. 9 of the 14 holes were drilled from the eastern flank and along the
southern strike of the existing pit, with 5 holes drilled from within the pit itself. The samples were
progressively sent for assay to Onsite Laboratory Services in Bendigo. Groundsearch had also
mobilised to site and conducted downhole optical televiewer logging of select holes to provide
Adavale with detailed structural imaging to better understand and define the controls of the
mineralisation at London Victoria. The assay results and structural review are expected to guide
future exploration activities at the mine.
4
On 8 September 2025, Adavale announced results from the first nine holes of the recently
completed maiden drilling program at the London-Victoria Gold Mine. The gold assay results for
the first batch of 1,375 samples from the first eleven (11) RC holes had been received from
Adavale’s recent drilling program at London-Victoria Gold Mine. Significantly, they represented the
first drill results from the gold project since 1997. The drilling was designed to cover multiple
targets along the full north-south strike of the open pit which spans over a 1.5km distance. Assay
results confirmed that gold mineralisation is present at shallow depths, both below and along
strike from the recently defined JORC MRE of 3.14Mt at 1.06g/t Au for 107koz.
Highlights from the first batch of assay results include 10m @ 1.95g/t Au (including 1m @ 8.3g/t
Au) and a significant high-grade intercept of 3m @ 6.64g/t Au including 1m @ 14.6g/t Au from
10m depth.
Observations within the pit during the drilling campaign suggested that the gross architecture of
the deposit is a doubly plunging fold and that the mineralisation plunges to the north and south.
This interpretation is now being followed up with specialist structural geology consultants Model
Earth to confirm and refine this model in order to better target high-grade gold mineralisation at
the London Victoria Mine.
Figure 5: Drill Collars of 14 RC holes drilled at London Victoria Mine.
5
Northern Pit
ALRC001 – 10m @ 1.95g/t Au from 149m lifted significantly and ended up intersecting the
mineralisation just below the mined pit.
Figure 6: Long Section showing the position of ALRC001 relative to historic drilling and the previously mined open
pit.
ALRC001 intersection relative to the bottom of the pit. LV prefix holes are historic drilling that were
used to define the 2025 JORC MRE 3.14Mt at 1.06g/t Au for 107koz.
6
ALRC007 – 8m @ 0.71g/t Au and ALRC008 – 6m @ 1.69g/t Au were drilled vertically from the
bottom of the current pit, designed to intersect the steeply east dipping mineralised horizon below
the current pit floor.
Figure 7: ALR007-008 Cross section looking north.
ALRC007 was collared in backfill material for the first 5m then drilled into the base of the previously
mined pit. This hole intersected 8m @ 0.71g/t Au.
ALRC008 was collared 13m to the east and intersected what is interpreted to be the same
mineralised horizon at 37m depth, returning 6m @ 1.69g/t Au.
Post open pit mining for gold the east wall of the pit outside of the mineralised zone has been
mined for quarry material fortuitously allowing the current drilling access and possible future
easily amenable pre-stripping.
7
Central Pit
ALRC004 – 4m @ 0.9g/t Au from 1m and 12m @ 1.48g/t Au
ALRC005 – 9m @ 0.91g/t Au from 4m
Figure 8: Long Section in the central portion of the 1.5km long open pit showing the location of ALRC004 and
ALRC006 gold intercepts relative to historic drilling and previously mined pit.
ALRC004 (12m @ 1.48g/t Au from 38m) was collared in backfill and drilled into the base of the
historic pit at approximately 25m downhole and then intersected the mineralised horizon oblique
to the strike at 38m depth. The hole was originally designed to test for high-grade veining
perpendicular to the strike of the London-Victoria Pit, similar to that seen historically at the Koh-I-
Nor Project, located 2.7km to the east.
Two short vertical holes were drilled adjacent to ALRC004. ALRC005 that intersected the
mineralised horizon from 5m, returning 9m @ 0.91g/t Au. Hole ALRC006 failed to reach the target
depth.
8
Southern Pit
ALRC011 - 3m @ 6.64g/t Au from 10m
Designed to test the concept of a fold hinge plunging to the south deviated strongly, but
fortuitously intersected high-grade shallow gold south of the previously mined pit.
ALRC009 - 3m @ 1.92g/t Au from 9m
Collared into approximately 9m of backfill and intersected shallow gold mineralisation immediately
below a shallow portion of the open pit.
Figure 9: Plan view of the southern portion of the open pit showing the location of ALRC009 and ALRC011 gold
intercepts relative to the historic drilling and pit bounds. The depth of the narrow pit is approximately 12m deep.
Historic hole LVR028 (6m @ 3.27g/t Au from 21m) is below the historically mined pit and remains not mined.
Location of the three holes with assays pending ALRC0012-014.
9
Magnetic Susceptibility readings were routinely collected on the RC samples during the drilling
program. The two major rock types are foliated sediments and andesitic volcanics. The volcanic
rocks are variably magnetic due to the presence of magnetite. This results in a variable positive
magnetic response; it was observed that the volcanics associated with the gold mineralisation
appears to have a low magnetic response which is interpreted to be either magnetite alteration
associated with the mineralising event adjacent to the gold mineralisation and/or magnetite
destruction associated with the alteration proximal to the gold mineralisation. Either way, a
magnetic low in an airborne or ground based magnetic surveying will reliably act as a proxy for the
gold mineralisation and will be of significant value in future drill targeting.
Figure 10: ALRC001 Graph showing the downhole spatial association between magnetic susceptibility (blue) and Au
g/t (orange). Rock types were foliated sediments to 17m then foliated volcanics from 17m to EOH.
10
On 24 September 2025, Adavale announced the results from the final three holes (651m) of the
completed maiden drilling program at The London-Victoria Gold Mine.
Figure 11: ALRC014 Cross Section (red arrows indicating mineralisation is open at depth). NOTE: Red arrows on the
long section above indicate the possible plunge orientation of a doubly plunging anticline showing the
mineralisation open along strike and down plunge to the north and south.
11
ALRC014 has intercepted a previously undrilled, down dip extension to the London Victoria Gold
Deposit. On the same section to the east there is an historic shallow gold intercept in hole MB001
(Figure 11) that has not been followed up which potentially represents the top of a parallel zone of
mineralisation with a significant intercept of:
• 6m @ 3.31g/t Au from 12m (MB001)
MB001 was selectively sampled and has not been assayed below the interval 12m-18m.
The new assay results confirm that broad zones of gold mineralisation are present at shallow
depths below the recently defined JORC MRE of 3.14Mt at 1.06g/t Au for 107koz. Highlights from
the second batch of assay results include 48m @ 0.82g/t Au from 133m (0.25g/t Au cut-off) from
less than 100m below the pit floor. This intercept includes a higher-grade interval of 25m @ 1.17g/t
Au from 144m (0.5g/t Au cut-off).
Figure 12: ALRC014 interval 160m - 167m averaging 1.58g/t Au
This newly intercepted mineralisation extends the gold mineralisation over 100m below the pit
floor and well below the existing Mineral Resource Estimate (MRE).
The depth of the ALRC014 intercept (25m @ 1.17g/t Au) corresponds with a similar historic
intercept (LVD103) that is located 165m along strike to the south and this hole is included in the
current JORC 2012 MRE.
12
It is highly significant for the resource potential at London Victoria that historic drillhole LVD103
intersected two wide gold zones 11m apart downdip, and approximately 60m below the pit with
intercepts including:
• 29.3m @ 1.31g/t Au from 157m; and 21.6m @ 1.06g/t Au from 197.3m
Figure 13: LVD103 Cross Section (red arrows indicating mineralisation is open at depth NOTE: Red arrows on the
long section above indicate the possible plunge orientation of a doubly plunging anticline showing the
mineralisation open along strike and down plunge to the north and south.
13
Southern Pit
ALRC012 - 5m @ 0.63g/t Au from 61m
This hole was designed to test for an eastern anticlinal limb to the mineralisation and intersected
5m of gold mineralisation at the expected position; spatially this intercept may correspond with
the shallow 3m @ 6.64g/t Au intersected in ALRC011.
ALRC013 - 7m @ 0.38g/t Au from 209m
Designed to test the concept of a fold hinge plunging to the south; deviated strongly but
fortuitously intersected high-grade shallow gold mineralisation well south of the previously mined
pit.
ALRC014 - 25m @ 1.17g/t Au from 144m, 100m below the pit floor
Designed to test the down plunge extension of the historic mined gold in the southern pit. ALRC014
has successfully intercepted a wide zone of gold mineralisation, some 100m below the pit floor,
and well outside of the current MRE.
Figure 14: Plan view of the southern portion of the open pit showing the location of ALRC009 - ALRC014 gold
intercepts relative to the historic drilling and pit bounds. The depth of the narrow pit is approximately 12m deep.
Historic hole LVR028 (6m @ 3.27g/t Au from 21m) is below the historically mined pit and remains not mined.
14
Next Steps at London Victoria Mine
• Magnetic Survey: In the light of the positive magnetics vs gold association (see ASX:ADD
announcement dated 8th
of September 2025) airborne and/or ground based magnetic
survey planning is underway.
• Structural Geology Mapping: A leading structural geology consultant has structurally
mapped and modelled the deposit to help refine and add focus to future drill targeting.
Review of the results are ongoing.
• Follow-up Drilling: Additional drill planning will follow upon receiving the final analysis
from the remaining three holes and in conjunction with structural and geophysical surveys.
Ashes & Myalls Prospects
On 26 August 2025, Adavale announced that it was advancing the Ashes Prospect by focusing on
collecting more detailed geophysical data to refine future drilling targets.
Current Exploration Activities include:
1. Ground Magnetics Survey
• A high-resolution ground-based magnetics survey was undertaken across the broader
Ashes- Myalls Prospect (Figure 15).
• The survey covered 11.9km² on 50m line spacing, totalling 238-line km; the enhanced
magnetic data provides better resolution that the wider spaced regional magnetics and
was designed to detect subtle anomalies, including the potential for small footprint but
highly prospective pipe-like porphyry related intrusive systems.
2. Induced Polarisation (IP) Survey
• In conjunction with the magnetics, an IP survey was undertaken proximal to a
previously defined strong 50 mV/V chargeability anomaly at Ashes, which remains open
to the north (Figure 16).
• The survey included 4 x 1,600m lines, spaced 200m apart, aimed at better defining the
geometry and extent of the anomaly to the north.
• This work builds on earlier exploration, as previous efforts by Meridian Minerals (2009)
and AngloGold Ashanti (2015) provided limited data and most likely did not fully test
the known anomaly.
15
Figure 15: Ashes and Myalls Prospects highlighting Magnetic and IP survey locations.
16
Figure 16: Ashes Prospect - 3D View of Inverted Chargeability Sections (from the SE looking NW)
Other Parkes Project prospects
On 4 July 2025, Adavale provided an update on the Company’s activity at the Parkes Gold and
Copper Project following a site visit from 23-25 June 2025.
The site visit consisted of initial reconnaissance at the Cunich Prospect (EL8830) where previous
exploration returned results from surface up to 1.46g/t Au in strongly argillic altered Ordovician
volcanics and volcaniclastics coinciding with a magnetic low. A preliminary site visit was also
conducted at the Golden Bar Area located about 2km southwest from Cunich. At Parkvale South,
further rock chip sampling was carried out as follow-up to the high-grade result received from an
earlier Adavale rock chip sample that assayed 22.2g/t Au. At the Koh-I-Noor Mine on newly granted
EL9785, a drone photogrammetry survey identified an east west orientation of the historic
workings where initial rock chip sampling was also conducted. A total of 27 rock chip samples have
been taken across the 4 location areas (Figure 17).
The site visit contributed to the Company’s multi-phase exploration strategy targeting high-grade
gold and copper mineralisation across multiple prospects in the region.
17
Figure 17: Adavale’s Parkes Project in the Lachlan Fold Belt of NSW
18
Figure 18: Adavale Geological team inspecting historical workings at Koh-I-Nor.
Next Steps at the Wider Parkes Project
During and after the Quarter, multiple ongoing exploration efforts continued to take place at the
Parkes Project simultaneously, with key projects and milestones including:
• Further Geochemical Survey Planning: Identification of future targets for geochemical
work to take place simultaneously with other activity; Parkvale South becoming a high
priority dependent on results of further rock chip sampling and upcoming ground
magnetics.
• Further Prospect Reconnaissance: Visits to additional targets being planned for future
reconnaissance efforts, including additional areas on No Mistake (EL8830) and an initial visit
to The Dish (EL9711), as well as the Northern Areas of Front Gate (EL8831).
Recently, in mid-August, Adavale collected 12 rock chip samples from the Corner prospect, which
is located in the northwestern block of EL8831.
19
Other Projects
Uranium Projects – SA
No significant exploration activities were undertaken during the Quarter.
Following the Quarter’s end, on 22 October 2025, Adavale announced that it, through its wholly
owned subsidiary Adavale Minerals Pty Ltd:
1. Had executed a Native Title Mining Agreement (NTMA) with The Dieri Aboriginal
Corporation RNTBC (TDAC) for the area of the Marree Embayment Project (Marree Project)
where the Dieri people are the native title holders (which is now with the Department for
Energy and Mining for registration); and
2. Would shortly be executing a NTMA with the Adnyamathanha Traditional Lands Association
(Aboriginal Corporation) (ATLA), following receipt by ATLA of the Adnyamathanha
community’s consent to the proposed terms of the NTMA, for the area of the Maree Project
where the Adnyamathanha people are the native title holders.
Significantly, the NTMA with ATLA will be the first new NTMA with ATLA in over 5 years,
demonstrating Adavale’s strong and collaborative relationship with Native Title Holders and their
communities. The achievement of Native Title consent unlocks the strategic value of the Marree
Project, providing the necessary framework for Adavale to pursue pathways which can maximise
value for all investors and stakeholders.
Figure 19: Location map of Adavale’s Maree Project in relation to the Adnyamathanha and Dieri native title
Determination Areas.
20
Figure 20: Adavale’s Maree Project relative to Beverley & the Four Mile Mine
Adavale acknowledges the Adnyamathanha and Dieri as Traditional Custodians of the land on
which our current works are located. With respect to Elders past, present and emerging, Adavale
is committed to conducting its activities with respect to the communities in which it operates.
Kabanga Jirani Nickel Project and Luhuma Nickel Project (Tanzania)
No significant exploration activities were undertaken during the Quarter.
The Company continues to plan for a resumption of exploration activities once the nickel market
recovers.
Corporate
Capital Raise
On 4 July 2025, Adavale announced that it had received firm commitments to raise up to $2.5
million at $0.021 per share (Placement). The Directors agreed to participate in the Placement for
up to $152,000, which was subsequently approved by shareholders on 5 September 2025 at a
General Meeting.
In addition, on 25 July 2025, Adavale announced it had received further firm commitments from a
new Strategic Investor Group to raise up to $0.588 million at $0.021 per share (Placement). The
Placement investors agreed to voluntarily escrow their New Shares for 3 months from the date of
issue.
21
Appointment of Managing Director
Subsequent to quarter end, the Company announced the appointment of Mr David Ward, current
Non-Executive Technical Director, as Managing Director of the Company effective from 17th
November 2025.
David brings 30 years of industry experience with a proven track record of delivering value in
exploration, project development and mining operations. His experience across the Lachlan Fold
Belt will be pivotal as Adavale rapidly advances exploration and drill programmes across the
flagship Parkes Gold Copper Project.
Summary of Cashflow for the Quarter
Adavale held cash reserves at the end of the quarter of approximately $1.95m. During the quarter,
payment to related parties of the Company and their associates during the quarter was $40,000
(as shown at 6.1), which includes director and consulting fees. These payments were paid in
accordance with the directors’ contracts.
During the quarter, the Company spent approximately $771,000 on exploration and evaluation
activities as per the table below. There were no substantive mining production and development
activities during the quarter.
Project Nature of expenses Amount $
Parkes Gold and Copper Project
Geophysics 68,000
Geological and other consultancy services 243,000
Travel and field expenses 29,000
Drilling and assay costs 243,000
Sub-total 583,000
Uranium Projects (South Australia)
Tenement management fees 1,000
Annual rent and rates 19,000
Geological and other consultancy services 9,000
Heritage/Native title expenses 62,000
Sub-total 91,000
Kabanga and Luhuma Nickel Project
Project administration and compliance expenses 33,000
Field expenses 8,000
Geology consultants, field workers and other staff salaries 55,000
Annual rent and rates 1,000
Sub-total 97,000
TOTAL EXPLORATION AND EVALUATION EXPENDITURE 771,000
22
This announcement is authorised for release by the Board of Adavale Resources Limited.
Further information:
Allan Ritchie
Executive Chairman and CEO
Adavale Resources
E: investor@adavaleresources.com
P: +61 2 8003 6733
Jane Morgan
Media and Investor Inquiries
Jane Morgan Management
E: jm@janemorganmanagement.com.au
P: +61(0) 405 555 618
Forward Looking Statements
Certain statements in this announcement are or may be “forward-looking statements” and
represent Adavale’s intentions, projections, expectations, or beliefs concerning among other
things, future exploration activities. The projections, estimates and beliefs contained in such
forward-looking statements don’t necessarily involve known and unknown risks, uncertainties, and
other factors, many of which are beyond the control of Adavale Resources, and which may cause
Adavale Resources actual performance in future periods to differ materially from any express or
implied estimates or projections. Nothing in this announcement is a promise or representation as
to the future. Statements or assumptions in this announcement as to future matters may prove to
be incorrect and differences may be material. Adavale Resources does not make any
representation or warranty as to the accuracy of such statements or assumptions.
Competent Persons Statement
The information in this announcement that relates to Exploration Targets, Exploration Results,
Mineral Resources or Ore Reserves is based on information compiled by Barry Willott, who is
employed by Desdinova Metals Pty Ltd as consultant to Adavale Resources Ltd. Mr Willott is a
Member of The Australian Institute of Geoscientists (AIG) and The Australasian Institute of Mining
and Metallurgy (AusIMM). Mr Willott has sufficient experience that is relevant to the style of
mineralisation and type of deposit under consideration and to the activity being undertaken to
qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for
Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Willott consents to the
inclusion in the presentation of the matters based on his information in the form and context in
which it appears.
23
ASX Announcement References
• 1 July 2025: Drilling Commences at London Victoria Mine
• 4 July 2025: Successful $2.65M Placement to Accelerate Parkes Drilling
• 4 July 2025: Further prospect assessment at Parkes Project
• 16 July 2025: London Victoria Mine Drilling Update
• 25 July 2025: Adavale Secures New Strategic Investor Group
• 4 August 2025: London Victoria Maiden Drilling Campaign Completed
• 26 August 2025: Drill Target Definition Advancing at Ashes Prospect
• 8 September 2025: Shallow High-Grade Gold Intercepts Confirm Growth Upside
• 24 September 2025: Wide Gold Intercepts Confirm Open Mineralisation
• 22 October 2025: 100% Native Title Consent for Marree Project Achieved
The Company confirms that it is not aware of any new information or data that materially affects the
information included in the original market announcements. The Company confirms that the form and
context in which the Competent Person’s findings are presented have not been materially modified from the
original market announcement.
London Victoria JORC 2012 Mineral Resource Estimate at 30 September 2025
Information on the Mineral Resources presented on the London-Victoria deposit is contained in the ASX
announcement dated 5 May 2025. Where the Company refers to Mineral Resource in this presentation, it
confirms that it is not aware of any new information or data that materially affects the information included
in that announcement and all material assumptions and technical parameters underpinning the Mineral
Resource estimate with that announcement continue to apply and have not materially changed. The
Company confirms that the form and context their with JORC Table 1 in which the Competent Person’s
findings are presented have not materially changed from the original announcement.
24
Schedule of Mining Tenements and Beneficial Interests
Held as at the end of the September 2025 Quarter
Project/Location Country Tenement
Percentage
held/earning
Parkes Gold-Copper Project Australia EL7242 72.5%
EL8830 72.5%
EL8831 72.5%
EL9711 72.5%
EL9785 100%
Kabanga Jirani Nickel Project Tanzania Kabanga West (PL11590/2021) 100%
Kabanga North (PL 11405/2020) 100%
Kabanga North East (PL 11406/2020) 100%
Kabanga East (PL 11591/2021) 100%
Ruiza NE (PL 11592/2021) 100%
Kabanga South East (PL11886/2022)
Southeast Wedge (PL12175/2023)
100%
100%
Luhuma Central (PL12350/2023) 100%
Luhuma Nickel Project Tanzania PL11692/2021 65%
PL11693/2021 65%
The Company entered into a Farm-In Agreement to earn up to 100% of the Luhuma Nickel Project. The Company
currently has achieved a 65% interest in the project on 8 February 2023.
Nachingwea Prospect Tanzania PL11887/2022 100%
Lake Surprise Uranium Project Australia
EL5892
EL5893
EL6598
100%
Maree Embayment Uranium
Project
Australia
EL6821
EL6957
EL6890
100%
MacDonnell/George Creek
Uranium Project
Australia EL6533 100%
Narlaby and Tolmer Uranium
Project
Australia
EL7014
EL7024
EL7026
EL7025
100%
Yalgoo Project (Western
Australia)
Australia EL59/2931 100%
Acquired during the September 2025 Quarter
Project/Location
Country Tenement Granted/
Acquired Date
Yalgoo Project (Western Australia) Australia EL59/2931 July 2025
25
ABOUT ADAVALE RESOURCES
Exploring for Gold and Copper in the NSW Lachlan Fold Belt, Uranium in South Australia, and Nickel
Sulphide in Tanzania.
The Parkes Project
Adavale Resources Limited (ASX:ADD)
tenements span ~371km2
including 100% of
EL9785 and a 72.5% interest in the Parkes
Gold and Copper Project, consisting of four
granted exploration licences that are highly
prospective for Au-Cu, primarily due to their
location adjacent the giant Northparkes
copper-gold mine and encompassing the
Ordovician-aged rocks of the Macquarie Arc,
within the crustal-scale structure of the
Lachlan Transverse Zone (LTZ) that contain
both Northparkes and the world-class Cadia
gold-copper Mine.
South Australian Uranium Portfolio
Adavale also holds 11 granted exploration
licences that are prospective for their
sedimentary uranium potential. 7 are held
within the northern part of the highly-
prospective Northern outwash from the
Flinders Ranges in South Australia, as well as
4 granted exploration licence east of Ceduna
on the Eyre Peninsula, increasing Adavale’s
uranium tenement holdings to 4,959km2
.
The Kabanga Jirani Nickel Project
Adavale also holds the Kabanga Jirani
Share your feedback
Discover