Quarterly Activities and Cashflow Report
Released
Released
Announcement PDF
\
www.adavaleresources.com
Adavale Resources Limited
Level 2, 49 Oxford Close
West Leederville, WA, 6007
Directors & Officers
ALLAN RITCHIE
Executive Chairman & CEO
DAVID WARD
Managing Director
NIC MATICH
Non-Executive Director
LEONARD MATH
CFO & Company Secretary
ASX: ADD
Adavaleresources
AdavaleL
Investors@adavaleresources.com
+61 2 8003 6733
ASX ANNOUNCEMENT
30 January 2026
Quarterly Activities Report
For the quarter ended 31st
December 2025
Highlights
• High-conviction Phase 2 RC drilling program at the London-Victoria Mine
completed: Program consisting of 12 holes for 2,411 metres, targeting extensions to
gold mineralisation beneath the existing open pit and outside the current JORC 2012
Mineral Resource Estimate (MRE).
• Highest-grade gold intercepts to date at London-Victoria: Highlights include 14m
@ 2.62g/t Au and 23m @ 1.64g/t Au, from the first 5 holes with results from additional
holes pending adding further conviction to the near term production opportunity.
• Strengthened executive leadership: Appointment of Mr David Ward as Managing
Director, bringing over 30 years of exploration, development and operational
experience within the Lachlan Fold Belt.
• Geological understanding of the London-Victoria deposit continues to advance:
Completion of an independent structural geology study and integration of historic BHP
Gold grade control data; identifying stacked mineralised zones and confirming the
mineralised system remains open at depth, down plunge and along strike.
• Continued progression of regional and greenfields exploration across the wider
Parkes Project: Completion of ground magnetic surveys and reconnaissance rock chip
sampling at priority prospects including Corner and Parkvale South.
• Secured 100% Native Title consent across Marree Uranium Project: Materially de-
risking the South Australian project and enabling future exploration and drilling
activities.
Adavale Resources Executive Chairman and CEO, Mr. Allan Ritchie, commented:
“This has been yet another critical period for Adavale as we continue to progress with unlocking the
great potential we see at the Parkes Project. The completion of our Phase 2 drilling campaign at London-
Victoria, further bolstered by the work we have done in advancing our structural understanding of the
deposit, has further reinforced the confidence we have in the scale and continuity of the mineralisation
beyond the exiting resource at the site.
The appointment of Mr David Ward as our new Managing Director has also strengthened our technical
and operational capability at this important next stage for Adavale. We are excited to see his hands-on
leadership demonstrated to shareholders, with the swift and systematic exploration work we have
already carried out this Quarter. With Phase 1 drilling assays delivering the widest intercept in 30 years
at London-Victoria, followed up with post-quarter Phase 2 drilling assays giving our highest gold grade
intercepts to date, continue to strengthen our near term production strategy. The Company remains
confident that our pipeline of follow-up work we have planned for CY2026 will build on the momentum
we have already achieved and carry-on into this next key phase.”
2
Adavale Resources Limited (ASX:ADD) (“Adavale” or the “Company”), is pleased to report on
its activities for the quarter ended 31 December 2025 (the “Quarter”).
Overview of Operations
During the December 2025 Quarter, Adavale has made substantial operational progress in
achieving several major exploration milestones across its flagship Parkes Gold and Copper
Project (“Parkes Project”), located in the Lachlan Fold Belt of New South Wales. Activities during
the Quarter were primarily focused around advancing the London-Victoria Gold Mine (“London-
Victoria”) on EL7242, through technically driven drilling activities and related structural studies
and mapping. In addition, the progressing of high-priority greenfields prospects has occurred, as
well as strengthening the Company’s Management Team and Board of Directors to support
accelerated exploration work moving into CY2026.
Figure 1: RC Drilling at the London-Victoria Gold Mine, looking North
Parkes Gold and Copper Project – Lachlan Fold Belt, NSW
London Victoria Gold Mine
On 17 November 2025, Adavale announced the completion of a detailed independent structural
geology study at London-Victoria, coupled with the recovery and analysis of historic BHP Gold
grade control data obtained from the site. This work was led by independent structural geologist
Ian E. Neilson MSc, and represents the first modern structural study that has been undertaken at
London-Victoria since mining operations ceased in the 1990s.
The study has identified a major east-dipping shear and associated anticline as the primary control
for gold mineralisation over a 1.5km strike length at London-Victoria. This interpretation also
highlights the potential for fold repeats and stacked mineralised zones at depth, plunging to the
south and further indicating significant upside potential for resource growth extending beyond
London-Victoria’s existing Mineral Resource Estimate (3.14Mt at 1.06g/t Au for 107,000 oz).
3
Figure 2: Schematic Structural Geology cross section looking north for the southern portion of the London Victoria Pit;
demonstrating a parasitic fold on the east dipping limb of a larger anticlinal fold (preliminary interpretation pending further
structural studies) Red > 1.0g/t Au, Yellow = 0.5 - 1.0g/t Au
Figure 2: Some of the scanned and registered historic grade control maps (BHP Gold & Hargraves Resources, late 1980s–
1990s) overlayed on aerial photography of the London-Victoria open pit. Red > 2.0g/t Au, Yellow = 1.0 - 2.0g/t Au, Blue =
0.5 - 1.0g/t Au, Green <0.5g/t Au. Each small grid square represents 1m².
4
On 3 December 2025, Adavale also announced the commencement of its high-conviction Phase 2
reverse circulation (“RC”) drilling program at London-Victoria Mine. This drilling was designed to
test for extensions to mineralisation beneath the southern portion of the existing open pit at the
mine and also to follow-up results from the Company’s successful Phase 1 drilling campaign that
took place earlier in the year. Drill targeting for this campaign was informed by the newly
completed 3D structural geology model and was intended to evaluate potential growth beyond the
current JORC mineral resource footprint.
The drill program was completed on 18 December, with a total of 2,411m drilled across 12 holes.
Drill targets from the Phase 2 drilling program (Figure 3) were selected with the overall objective of
growing the Mineral Resource Estimate (“MRE”) at London-Victoria. Phase 2 drilling has focused on
testing the gold mineralised zone immediately below the pit floor and targeting extensions to the
mineralisation seen in ALRC014 (Figure 4) within the mineralised shear corridor, including a >1g/t
Au mineralised zone (illustrated in red, Figure 4). ALR014 intersected 48m at 0.82g/t Au from 133m
(including 25m at 1.2g/t Au from 144m), approximately 100 m below London-Victoria’s pit floor and
located well outside the current JORC resource area.
Figure 3: London-Victoria Gold Mine – Location of Completed Phase 1 and 2 Drilling Programs
5
Figure 4: ALRC014 from Phase 1 Drilling intersected the mineralisation ~100m below the pit floor at The London-Victoria
Gold Mine. Section B-B1
Subsequent to Quarter end, the Company announced the highest grade gold drilling intercepts to
date, including 14m at 2.62g/t Au from 133m (hole ALRC018) and 23m at 1.64g/t Au from 142m
(hole ALRC020), including higher-grade intervals of up to 2m at 5.17g/t Au. These initial results were
received from five of the twelve holes drilled, with assays pending for a further seven holes totalling
1,476 metres.
The recent results confirm the robustness and continuity of gold mineralisation beneath the
existing pit at London-Victoria. Consistent gold grades over wide intervals further demonstrate and
confirm that the mineralised system remains open at depth, down plunge and along strike.
Results from the current program will be used to guide further drilling campaigns, including an
imminent Phase 3 program aimed at increasing the gold inventory, along with supporting the
planning for metallurgical assessments and related scoping studies being scheduled for CY2026.
6
Figure 5: Section C-C’ Displaying position of ALRC018 Intercept in Cross Section
(red arrow indicating mineralisation is open at depth)
Strong foliation in the host rocks at London-Victoria cause significant unavoidable deviation in the drillhole paths; this is taken into
account when planning drillholes. In this case, ALRC017 and ALRC018 whilst collared in different positions ended up intersecting the
mineralised shear zone in a similar position.
7
Figure 6: Section A-A’ Displaying position of ALRC020 Intercept in Cross Section
(red arrow indicating mineralisation is open at depth)
8
Figure 7: Section B-B’ Displaying position of ALRC025 Intercept in Cross Section
NOTE: Red arrow on the long section above indicate the possible plunge orientation showing the mineralisation open
along strike and down plunge to the north and south
9
GREENFIELDS AND REGIONAL PROSPECTS – PARKES PROJECT
During the Quarter, Adavale continued advancement of greenfields exploration activities and
assessment across the Parkes Project, simultaneous with drilling campaign completion announced
at London-Victoria.
Ground magnetic surveys were completed over the Corner Prospect (EL8831), with processing and
interpretation currently pending. Reconnaissance rock chip sampling at Corner returned multiple
gold-bearing quartz vein samples, with some assays exceeding 1g/t Au. Best results include 1.16g/t
Au, 1.82g/t Au and 1.55g/t Au, which highlights the prospectivity of the target over a wide area.
The gold bearing veined samples are exposed at surface within sub-cropping metasediments and
display multiple overprinting vein textures, suggestive of a long lived and fertile hydrothermal
system. This is noteworthy, as the Corner Prospect lies on a direct line half-way between a porphyry
Cu-Au deposit (Northparkes) and a high-sulphidation epithermal deposit (Peak Hill).
Figure 8: Corner Prospect EL8831 – Rock chip samples on aerial photo displaying recently completed ground magnetic
survey (hatched).
On EL8830, ground magnetics have now been completed subsequent to the Quarter end at the
highly prospective Parkvale South Prospect, which has previously returned rock chip assays up to
22.2g/t Au.1
Work at Corner and Parkvale South are part of a systematic and continual evaluation
of the multiple greenfields prospects through the Parkes Copper-Gold Project Area that will
continue into the New Year.
1
Refer to ASX announcement, “Parkvale South Prospect Returns 22.2g/t Au Rock Chip”, 21 May 2025
10
SOUTH AUSTRALIAN URANIUM PROJECTS
On 22 October 2025, Adavale announced that it had secured 100% Native Title consent across its
Marree Uranium Project in the state of South Australia. The Company detailed that it has executed
a Native Title Mining Agreement with The Dieri Aboriginal Corporation and received consent from
the Adnyamathanha Traditional Lands Association, with execution of the remaining agreement
said to be expected imminently at the time of the announcement.
While Adavale’s primary operational focus during the Quarter and currently remains to be on the
Parkes Project, the completion of Native Title agreements materially de-risks the South Australian
uranium project as part of the Company’s broader portfolio, also positioning the Project for future
advancement.
Adavale acknowledges the Adnyamathanha and Dieri as Traditional Custodians of the land on
which our current works are located. With respect to Elders past, present and emerging, Adavale
is committed to conducting its activities with respect to the communities in which it operates.
Figure 9: Location map of Adavale’s Maree Project in relation to the Adnyamathanha and Dieri native title Determination
Areas
11
Figure 10: Adavale’s Maree Project relative to Beverely & the Four Mile Mine
Kabanga Jirani Nickel Project and Luhuma Nickel Project (Tanzania)
No significant exploration activities were undertaken during the Quarter.
The Company continues to plan for a resumption of exploration activities once the nickel market
recovers.
12
CORPORATE
Transformational appointment – Managing Director
On 27 October 2025, Adavale announced the appointment of Mr David Ward as Managing Director
of the Company, effective as of 17 November 2025. Mr Ward transitioned from his existing role
with Adavale as Non-Executive Technical Director, stepping into the executive position at a pivotal
time for the Company as it accelerates exploration activities across the Parkes Project, thanks to
his expertise and experience in the Lachlan Fold Belt region of New South Wales.
Mr Ward brings more than 30 years of industry experience spanning early-stage exploration,
project development and mining operations. His experience across the Lachlan Fold Belt includes
roles with Hargraves Resources, the last operator of the London-Victoria Gold Mine, and
Newmont’s Cadia Gold Mine. There, he was involved in production and resource definition
activities for Newmont. Dr Ward has also conducted porphyry gold-copper exploration across
major Ordovician intrusive centres including Northparkes, Narromine, Wellington and Lake Cowal.
In the announcement, Mr Ward’s experience was highlighted for being instrumental in defining
approximately 950,000 ounces of gold resources for Bacchus Resources, and he has been involved
in the development of multiple exploration assets that were later incorporated into ASX-listed
companies.
Since assuming the role of Managing Director, Mr Ward has directly led the Phase 2 drilling
program at London-Victoria taking place throughout the Quarter, as well as overseen the
advancement of greenfields exploration activities at the broader Pakes Project area and targets
(e.g., the Corner and Parkvale South Prospects).
Summary of Cashflow for the Quarter
Adavale held cash reserves at the end of the quarter of approximately $1.27m. During the quarter,
payment to related parties of the Company and their associates during the quarter was $35,000
(as shown at 6.1), which includes director and consulting fees. These payments were paid in
accordance with the directors’ contracts.
During the quarter, the Company spent approximately $471,000 on exploration and evaluation
activities as per the table below. There were no substantive mining production and development
activities during the quarter.
Project Nature of expenses Amount $
Parkes Gold and Copper Project
Geophysics 92,000
Geological and other consultancy services 34,000
Travel and field expenses 19,000
Drilling and assay costs 19,000
Annual rent and rates 5,000
Other 5,000
Sub-total 174,000
Uranium Projects (South Australia)
Tenement management fees 1,000
Annual rent and rates 41,000
13
Geological and other consultancy services 10,000
Heritage/Native title expenses 105,000
Sub-total 157,000
Kabanga and Luhuma Nickel Project
Project administration and compliance expenses 51,000
Geology consultants, field workers and other staff salaries 62,000
Annual rent and rates 23,000
Travel expenses 4,000
Sub-total 140,000
TOTAL EXPLORATION AND EVALUATION EXPENDITURE 471,000
This announcement is authorised for release by the Board of Adavale Resources Limited.
Further information:
Allan Ritchie
Executive Chairman and CEO
Adavale Resources
E: investor@adavaleresources.com
P: +61 2 9127 9852
David Ward
Managing Director
Adavale Resources
E: investor@adavaleresources.com
P: +61 2 9127 9852
Jane Morgan
Media and Investor Inquiries
Jane Morgan Management
E: jm@janemorganmanagement.com.au
P: +61(0) 405 555 618
Forward Looking Statements
Certain statements in this announcement are or may be “forward-looking statements” and
represent Adavale’s intentions, projections, expectations, or beliefs concerning among other
things, future exploration activities. The projections, estimates and beliefs contained in such
forward-looking statements don’t necessarily involve known and unknown risks, uncertainties, and
other factors, many of which are beyond the control of Adavale Resources, and which may cause
Adavale Resources actual performance in future periods to differ materially from any express or
implied estimates or projections. Nothing in this announcement is a promise or representation as
to the future. Statements or assumptions in this announcement as to future matters may prove to
be incorrect and differences may be material. Adavale Resources does not make any
representation or warranty as to the accuracy of such statements or assumptions.
14
Competent Persons Statement
The information in this document that relates to exploration results on the London Victoria Mine
is based on information compiled by David Ward BSc, a Competent Person who is a Member of the
Australasian Institute of Mining and Metallurgy (AUSIMM), (Member 228604). David Ward has over
25 years of experience in metallic minerals mining, exploration and development and has sufficient
experience that is relevant to the style of mineralisation and type of deposit under consideration
and to the activity being undertakingto qualify as a ‘Competent Person’ as defined under the 2012
Edition of the ‘Australasian Code for Reporting ofExploration Results, Mineral Resources and Ore
Reserves’. Mr Ward consents to the inclusion in this report of the matters based on his information
in the form and context in which it appears.
The information in this announcement that relates to Exploration Targets, Exploration Results,
Mineral Resources or Ore Reserves is based on information compiled by Barry Willott, who is
employed by Desdinova Metals Pty Ltd as consultant to Adavale Resources Ltd. Mr Willott is a
Member of The Australian Institute of Geoscientists (AIG) and The Australasian Institute of Mining
and Metallurgy (AusIMM). Mr Willott has sufficient experience that is relevant to the style of
mineralisation and type of deposit under consideration and to the activity being undertaken to
qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for
Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Willott consents to the
inclusion in the presentation of the matters based on his information in the form and context in
which it appears.
ASX Announcement References
• 20 January 2026: Highest Grade Intercept at London Victoria
• 22 December 2025: High Conviction Drilling Completed
• 3 December 2025: High Conviction Phase 2 Drilling Underway at London-Vic
• 17 November 2025: Major Resource Growth Uncovered at London-Vic
• 27 October 2025: Transformational Appointment to Drive Gold & Copper Growth
• 22 October 2025: 100% Native Title Consent for Marree Project Achieved
The Company confirms that it is not aware of any new information or data that materially affects the
information included in the original market announcements. The Company confirms that the form and
context in which the Competent Person’s findings are presented have not been materially modified from the
original market announcement.
London Victoria JORC 2012 Mineral Resource Estimate at 31 December 2025
Information on the Mineral Resources presented on the London-Victoria deposit is contained in the ASX
announcement dated 5 May 2025. Where the Company refers to Mineral Resource in this presentation, it
confirms that it is not aware of any new information or data that materially affects the information included
in that announcement and all material assumptions and technical parameters underpinning the Mineral
Resource estimate with that announcement continue to apply and have not materially changed. The
Company confirms that the form and context their with JORC Table 1 in which the Competent Person’s
findings are presented have not materially changed from the original announcement.
15
Schedule of Mining Tenements and Beneficial Interests
Held as at the end of the December 2025 Quarter
Project/Location Country Tenement
Percentage
held/earning
Parkes Gold-Copper Project Australia EL7242 72.5%
EL8830 72.5%
EL8831 72.5%
EL9711 72.5%
EL9785 100%
Kabanga Jirani Nickel Project Tanzania Kabanga West (PL11590/2021) 100%
Kabanga North (PL 11405/2020) 100%
Kabanga North East (PL 11406/2020) 100%
Kabanga East (PL 11591/2021) 100%
Ruiza NE (PL 11592/2021) 100%
Kabanga South East (PL11886/2022)
Southeast Wedge (PL12175/2023)
100%
100%
Luhuma Central (PL12350/2023) 100%
Luhuma Nickel Project Tanzania PL11692/2021 65%
PL11693/2021 65%
The Company entered into a Farm-In Agreement to earn up to 100% of the Luhuma Nickel Project. The Company
currently has achieved a 65% interest in the project on 8 February 2023.
Nachingwea Prospect Tanzania PL11887/2022 100%
Lake Surprise Uranium Project Australia
EL5892
EL5893
EL6598
100%
Maree Embayment Uranium
Project
Australia
EL6821
EL6957
EL6890
100%
MacDonnell/George Creek
Uranium Project
Australia EL6533 100%
Narlaby and Tolmer Uranium
Project
Australia
EL7014
EL7024
EL7026
EL7025
100%
Yalgoo Project (Western
Australia)
Australia EL59/2931 100%
16
ABOUT ADAVALE RESOURCES
Exploring for Gold and Copper in the NSW Lachlan Fold Belt, Uranium in South Australia, and Nickel
Sulphide in Tanzania.
The Parkes Project
Adavale Resources Limited (ASX:ADD)
tenements span ~371km2
including 100% of
EL9785 and a 72.5% interest in the Parkes
Gold and Copper Project, consisting of four
granted exploration licences that are highly
prospective for Au-Cu, primarily due to their
location adjacent the giant Northparkes
copper-gold mine and encompassing the
Ordovician-aged rocks of the Macquarie Arc,
within the crustal-scale structure of the
Lachlan Transverse Zone (LTZ) that contain
both Northparkes and the world-class Cadia
gold-copper Mine.
South Australian Uranium Portfolio
Adavale also holds 11 granted exploration
licences that are prospective for their
sedimentary uranium potential. 7 are held
within the northern part of the highly-
prospective Northern outwash from the
Flinders Ranges in South Australia, as well as
4 granted exploration licence east of Ceduna
on the Eyre Peninsula, increasing Adavale’s
uranium tenement holdings to 4,959km2
.
The Kabanga Jirani Nickel Project
Adavale also holds the Kabanga Jirani Nickel
Project, a portfolio of 13 highly prospective
granted licences along the East African Nickel
belt in Tanzania. The nine southernmost
licences are proximal to the world class
Kabanga Nickel Deposit (87.6Mt @ 2.63% Ni
Eq). Adavale holds 100% of all licences except
for two licences that are known as the
Luhuma-Farm-in, which are held at 65%,
adding a further 99km2
and bringing the
portfolio to 1,315km2
. Adavale’s licences were
selected based on their strong geochemical
and geophysical signatures from the previous
exploration undertaken by BHP.
Rule 5.5
ASX Listing Rules Appendix 5B (17/07/20) Page 1
+ See chapter 19 of the ASX Listing Rules for defined terms.
Appendix 5B
Mining exploration entity
quarterly cash flow report
Name of entity
ADAVALE RESOURCES LIMITED
ABN Quarter ended (“current quarter”)
96 008 719 015 31 December 2025
Consolidated statement of cash flows Current quarter
$A’000
Year to date
(6 months)
$A’000
1. Cash flows from operating activities
- -
1.1 Receipts from customers
1.2 Payments for
(471) (1,242)
(a) exploration & evaluation
(b) development - -
(c) production - -
(d) staff costs (56) (122)
(e) administration and corporate costs (219) (523)
1.3 Dividends received (see note 3) - -
1.4 Interest received - -
1.5 Interest and other costs of finance paid (15) (15)
1.6 Income taxes paid - -
1.7 Government grants and tax incentives - -
1.8 Other (GST (Paid)/Received) 59 1
1.9 Net cash from / (used in) operating
activities
(702) (1,901)
2. Cash flows from investing activities
- -
2.1 Payments to acquire or for:
(a) entities
(b) tenements - -
(c) property, plant and equipment (66) (66)
(d) exploration & evaluation - -
(e) investments - -
(f) other non-current assets (Bonds) (10) (10)
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 2
+ See chapter 19 of the ASX Listing Rules for defined terms.
Consolidated statement of cash flows Current quarter
$A’000
Year to date
(6 months)
$A’000
2.2 Proceeds from the disposal of:
- -
(a) entities
(b) tenements - -
(c) property, plant and equipment - -
(d) investments - -
(e) other non-current assets - -
2.3 Cash flows from loans to other entities - -
2.4 Dividends received (see note 3) - -
2.5 Other (provide details if material) - -
2.6 Net cash from / (used in) investing
activities
(76) (76)
3. Cash flows from financing activities
17 3,106
3.1 Proceeds from issues of equity securities
(excluding convertible debt securities)
3.2 Proceeds from issue of convertible debt
securities
- -
3.3 Proceeds from exercise of options - -
3.4 Transaction costs related to issues of equity
securities or convertible debt securities
- (141)
3.5 Proceeds from borrowings 87 87
3.6 Repayment of borrowings (1) (1)
3.7 Transaction costs related to loans and
borrowings
- -
3.8 Dividends paid - -
3.9 Other (provide details if material) - -
3.10 Net cash from / (used in) financing
activities
103 3,051
4. Net increase / (decrease) in cash and
cash equivalents for the period
4.1 Cash and cash equivalents at beginning of
period
1,948 201
4.2 Net cash from / (used in) operating
activities (item 1.9 above)
(702) (1,901)
4.3 Net cash from / (used in) investing activities
(item 2.6 above)
(76) (76)
4.4 Net cash from / (used in) financing activities
(item 3.10 above)
103 3,051
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 3
+ See chapter 19 of the ASX Listing Rules for defined terms.
Consolidated statement of cash flows Current quarter
$A’000
Year to date
(6 months)
$A’000
4.5 Effect of movement in exchange rates on
cash held
(2) (4)
4.6 Cash and cash equivalents at end of
period
1,271 1,271
5. Reconciliation of cash and cash
equivalents
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
Current quarter
$A’000
Previous quarter
$A’000
5.1 Bank balances 1,271 1,948
5.2 Call deposits - -
5.3 Bank overdrafts - -
5.4 Other (provide details) - -
5.5 Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
1,271 1,948
6. Payments to related parties of the entity and their
associates
Current quarter
$A'000
6.1 Aggregate amount of payments to related parties and their
associates included in item 1
35
6.2 Aggregate amount of payments to related parties and their
associates included in item 2
-
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 4
+ See chapter 19 of the ASX Listing Rules for defined terms.
7. Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
7.1 Loan facilities 87 87
7.2 Credit standby arrangements - -
7.3 Other (Convertible Notes) - -
7.4 Total financing facilities - -
7.5 Unused financing facilities available at quarter end -
7.6 Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as well.
Motor Vehicle (Mine spec) Finance
Lender: Maple Finance
Repayment schedule: 60 monthly instalments
Loan amount: Principal ($72k) and interest ($15k)
8. Estimated cash available for future operating activities $A’000
8.1 Net cash from / (used in) operating activities (item 1.9) (702)
8.2 (Payments for exploration & evaluation classified as investing
activities) (item 2.1(d))
-
8.3 Total relevant outgoings (item 8.1 + item 8.2) (702)
8.4 Cash and cash equivalents at quarter end (item 4.6) 1,271
8.5 Unused finance facilities available at quarter end (item 7.5) -
8.6 Total available funding (item 8.4 + item 8.5) 1,271
8.7 Estimated quarters of funding available (item 8.6 divided by
item 8.3)
1.81
Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as “N/A”.
Otherwise, a figure for the estimated quarters of funding available must be included in item 8.7.
8.8 If item 8.7 is less than 2 quarters, please provide answers to the following questions:
8.8.1 Does the entity expect that it will continue to have the current level of net operating
cash flows for the time being and, if not, why not?
Yes.
8.8.2 Has the entity taken any steps, or does it propose to take any steps, to raise further
cash to fund its operations and, if so, what are those steps and how likely does it
believe that they will be successful?
The Company confirms that it currently has sufficient funding to continue operating for the
next 2 quarters. If required, the Company will be able to conduct a capital raising via
placement of shares. The Board and Company has previously successful raise funds through
equity placement.
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 5
+ See chapter 19 of the ASX Listing Rules for defined terms.
8.8.3 Does the entity expec
Share your feedback
Discover