Second Luhuma Central Hole Commenced
Following Massive Sulphide Intercept
•
Diamond drilling of DDLUHC002 has commenced at Luhuma
Central
DIRECTORS & OFFICERS
GRANT PIERCE
CHAIRMAN
DAVID RIEKIE
EXECUTIVE DIRECTOR
JOHN HICKS
DIRECTOR
•
Diamond drilling to chase dip and strike extensions to the nickel
bearing massive sulphides intersected in DDLUHC001
•
DDLUHC002 expected to be drilled to ~400m but may be
extended
LEONARD MATH
CFO & COMPANY SECRETARY
•
Second diamond rig has commenced drilling the high priority
targets at HEM2
ISSUED CAPITAL
Adavale Resources Limited (ASX: ADD) (“or the Company”) is pleased
to advise that two diamond drill rigs are now underway at the Kabanga
Jirani Nickel Project in Tanzania (Figure 1).
Following the intersection of 4.15m of massive nickel sulphide associated
with a mafic-ultramafic intrusion between 223.35m and 227.50m in
drillhole DDLUHC001, the rig has commenced DDLUHC002 in an up dip
position, indicated by AMT to be potentially more favourable (Figure 2)1.
A second drill rig has also commenced drilling at HEM 2.
Adavale’s Executive Director, David Riekie commented:
“Following the excellent intersection in DDLUHC001, we have ramped up
exploration with one rig focused on Luhuma Central and the other rig
following up the high-priority targets at HEM 2 along the Luhuma trendline
4km to the SSW.”
ALLAN RITCHIE
CHIEF EXECUTIVE OFFICER
Shares: ~520 million
Unlisted options: 191 million
Performance rights: 17 million
ABOUT ADAVALE
Adavale Resources is an ASX-listed
exploration company targeting
projects in the 'battery materials‘
space. The company is currently
focused on both its 100% owned
Kabanga Jirani Nickel Project and
2 Farm-in ‘Luhuma’ licences
adjacent and along strike from the
world’s largest undeveloped high
grade NiS resource of 58Mt @
2.62% Ni. Adavale is also
progressing exploration on its
100% owned uranium tenements
in South Australia
Figure 1 Current drilling locations at Luhuma Central and HEM 2
Figure 2 Cross section showing DDLUHC001 and position of new hole DDLUHC002
ASX Announcement
2
This announcement is authorised for release by the Board of Adavale Resources Limited.
Further information:
For broker and media enquiries:
David Riekie
Executive Director
E: investor@adavaleresources.com
Andrew Rowell
White Noise Communications
E: andrew@whitenoisecomms.com
P: +61 400 466 226
References
1
See ASX announcement on 6 June 2023 titled “Massive Nickel Sulphides Intersected at Kabanga Jirani”.
Competent Persons Statement
The information in this release that relates to “exploration results” for the Project is based on information compiled or reviewed by Mr David
Dodd of MSA, South Africa. Mr Dodd is a consultant for Adavale Resources Limited and is a member of the SACNASP. Mr Dodd has
sufficient experience that is relevant to the style of mineralisation and type of deposits under consideration as well as to the activity that is
being undertaken to qualify as a Competent Person under the ASX Listing Rules. Mr Dodd consents to this release in the form and context
in which it appears.
Cautionary Statements
Visual estimates of mineral abundance should never be considered a proxy or substitute for laboratory analyses where concentrations or
grades are the factor of principal economic interest. Visual estimates also potentially provide no information regarding impurities or
deleterious physical properties relevant to valuations.
In relation to the disclosure of visual mineralisation and pXRF readings, the Company cautions that visual estimates of mineral abundance
and point source pXRF readings should never be considered a proxy or substitute for laboratory analyses where concentrations or grades
are the factor of principal economic interest. Visual estimates and pXRF reading also potentially provide no information regarding impurities
or deleterious physical properties relevant to valuations.
Forward looking statements
This document contains forward-looking statements concerning Adavale. Forward-looking statements are not statements of historical fact
and actual events and results may differ materially from those described in the forward-looking statements as a result of a variety of risks,
uncertainties and other factors. Forward-looking statements are inherently subject to business, economic, competitive, political and social
uncertainties and contingencies. Many factors could cause the Company’s actual results to differ materially from those expressed or implied
in any forward-looking information provided by the Company, or on behalf of the Company. Such factors include, among other things, risks
relating to additional funding requirements, metal prices, exploration, development and operating risks, competition, production risks,
regulatory restrictions, including environmental regulation and liability and potential title disputes. Forward looking statements in this
document are based on Adavale’s beliefs, opinions and estimates of Adavale as of the dates the forward-looking statements are made, and
no obligation is assumed to update forward looking statements if these beliefs, opinions and estimates should change or to reflect other
future developments. Although management believes that the assumptions made by the Company and the expectations represented by
such information are reasonable, there can be no assurance that the forward-looking information will prove to be accurate. Forward-looking
information involves known and unknown risks, uncertainties, and other factors which may cause the actual results, performance or
achievements of the Company to be materially different from any anticipated future results, performance or achievements expressed or
implied by such forward-looking information. Such factors include, among others, the actual market price of nickel, the actual results of
future exploration, changes in project parameters as plans continue to be evaluated, as well as those factors disclosed in the Company's
publicly filed documents. Readers should not place undue reliance on forward-looking information. The Company does not undertake to
update any forward-looking information, except in accordance with applicable securities laws. No representation, warranty or undertaking,
express or implied, is given or made by the Company that the occurrence of the events expressed or implied in any forward- looking
statements in this document will actually occur.
ASX Announcement
3
ABOUT ADAVALE
Adavale Resources Limited (ASX:ADD) is a nickel sulphide exploration company that holds 100% of the Kabanga Jirani Nickel Project,
a portfolio of 12 highly prospective granted licences covering ~1,216km2 along the Karagwe-Ankolean belt in Tanzania. The six
southernmost licences are proximal to the world-class Kabanga Nickel Deposit (58Mt @ 2.62% Ni). Adavale has farmed-in to two more
highly prospective licences contiguous to our seven southernmost licences, adding a further 99km2 to the portfolio 1,315sq km). Adavale’s
licences were selected based on their strong geochemical and geophysical signatures from the previous exploration undertaken by BHP.
Adavale also holds exploration licences for their sedimentary uranium potential within the northern part of the highly prospective Lake
Frome Embayment in South Australia.
ASX Announcement
4
Share your feedback
Discover