KEY HIGHLIGHTS
Parkes Gold and Copper Project, NSW
•
All-scrip acquisition of 72.5% interest in the Parkes Gold and Copper Project
located in the Lachlan Fold Belt of NSW, Australia
o Immediate focus on the London-Victoria Gold Mine, with historical
estimates of 3.70Mt @ 1.04g/t Au for 124koz gold1
o Diamond drilling completed in November 2024 demonstrates potential
12m thick down-dip extension of the London-Victoria mineralisation
•
Parkes Project acquisition was completed in January 2025 with the LondonVictoria tenement EL7242 successfully renewed until November 2030
Uranium Exploration Activities, SA
•
Cultural Heritage survey finalised at MacDonnell Creek (SA) with 2,000m
Uranium drilling program expected to commence in Q2 2025
Corporate
•
$1.675 million capital raising to professional and sophisticated investors with
Directors and Officers co-investing ~$100,000 (over 6%) of the Placement to
advance the Parkes Project announced during the quarter
•
Mr. Allan Ritchie transitioned to Executive Chairman on 31 October 2024
•
Adavale maintains a strong balance sheet following completion of the Tranche
2 Placement in January 2025
Adavale’s Executive Chairman and CEO, Mr. Allan Ritchie commented:
“The completion of both the Parkes Gold and Copper Project acquisition and recent Placement is a
critical step forward for Adavale, with enough funding for exploration and drilling on the numerous
highly prospective targets across our 4 licences located in the Lachlan Fold Belt, a Tier 1 mining
1
**Cautionary Statement: Readers are cautioned that the Historical Estimate for the London-Victoria deposit referred to in this
Announcement is not reported in accordance with the JORC 2012 Code. A Competent Person has not undertaken sufficient work to classify
the Historical Estimate as a Mineral Resource in accordance with the JORC 2012 Code. Nothing has come to the attention of Adavale that
causes it to question the accuracy or the reliability of the former owner’s Historical Estimate. However, Adavale has not independently
validated the former owner’s estimate and therefore is not to be regarded as reporting, adopting or endorsing the estimate. Following
evaluation and further exploration work, it is uncertain whether it will be possible to report the Historical Estimate as a Mineral Resource in
accordance with the JORC 2012 Code. The Historical Estimate has been reported in accordance with ASX Listing Rule 5.12. Refer to ASX
announcement 29th of November 2024 and the relevant appendixes and JORC tables for further information.
Directors & Officers
ALLAN RITCHIE
NIC MATICH
Executive Chairman & CEO
Non-Executive Director
JOHN HICKS
LEONARD MATH
Non-Executive Director
CFO & Company Secretary
Adavaleresources
www.adavaleresources.com
AdavaleL
Adavale Resources Limited
Level 2, 49 Oxford Close
West Leederville, WA, 6007
investor@advaleresources.com
+61 2 8003 6733
jurisdiction. One of Adavale’s licences also includes the London Victoria historic mine with a historic
resource of 124koz Au that Adavale will work on upgrading to JORC-qualifying status.
In addition, the Adavale team have just returned from a site visit and are very excited with the Parkes
Project and the opportunity it presents to develop solid shareholder value and we look forward to
providing regular updates from the Parkes Project throughout the exploration programs ahead.”
Adavale Resources Limited [ASX:ADD] (‘Adavale’ or the ‘Company’) is pleased to report on its
activities for the quarter ended 31 December 2024.
Parkes Gold and Copper Project (NSW)
During the quarter, Adavale announced the acquisition of a 72.5% interest in the Parkes Gold and
Copper Project (“Parkes Project”) on 29 November 2024. The acquisition was completed in January
2025. Refer to ASX announcement dated 29 November 2024 for the terms of the acquisition.
The Parkes Project is located within the prolific gold and copper producing Macquarie Arc portion of
the Lachlan Fold Belt in central NSW – hosting some of Australia’s most prolific gold and copper
mines. The acquisition includes four exploration tenements that encompass a total of 395km2 in an
area that is adjacent to the Northparkes copper gold-mine, as well as Cadia-Ridgeway – a world-class
deposit for copper and gold mineralisation.
The Exploration Licences (‘EL’s’) are situated where Early Ordovician-age Junee-Narromine Volcanic
Belt rocks of the western part of the Arc are intersected by the crustal-scale structural corridor of the
Lachlan Transverse Zone (‘LTZ’). Significantly, the LTZ is host to Tier 1 gold and copper mines, such
as Northparkes (5.2Moz Au & 4.4Mt Cu) and Cadia-Ridgeway (35.1Moz Au & 7.9Mt Cu) where it
intersects Macquarie Arc rocks (Figure 1).
The Parkes Project’s most advanced prospect is the former London-Victoria Gold Mine which saw
estimated historical production by BHP Gold and Hargraves of 200,000 to 250,000 ounces at a head
grade of 1.5-2g/t Au. A Historical Estimate of 3.7Mt at 1.04g/t Au for 123.8koz Au was defined for
London-Victoria.
At London-Victoria, it is intended to utilise the existing drillhole database, augmented by a small
number of new well-targeted deeper holes, to estimate a Mineral Resource. This opportunity comes
at relatively low cost and at a time of record gold prices. Recent diamond drilling at the mine
intersected a 12m potential down-dip extension of the deposit to be confirmed with assay results
expected soon.
In conjunction with the acquisition of the Project, Adavale received binding commitments to raise
$1.675 million (before costs) through a placement to new and existing sophisticated and professional
investors. Proceeds from the Placement will be used to accelerate exploration activities within the
Parkes Project with a primarily focus on increasing and upgrading the London-Victoria resource to
JORC-qualifying status.
Other prospects in the Parkes Project area include Ashes, Myalls, Corner, Parkvale, Cunich and
Birthday Mine. These prospects have had minimal or no drill testing but have recorded numerous
high-grade polymetallic rock chip sampling assay results with which to guide initial exploration
activities. Key drill intercepts and rock chips from the prospects are presented in Table 1.
2
The ‘walk up’ Ashes, Myalls and Corner Prospects are within tenement EL 8831; adjacent to and
approximately 10km east of the Northparkes mine which contains an endowment of 5.2Moz Au and
4.4Mt Cu. These prospects share similar geology to Northparkes, as well as significant gold, silver
and copper assay results in rock chip samples from the prospects, representing compelling
exploration targets worthy of early follow-up by the Company (Figure 2).
Ashes is a particularly compelling porphyry copper-gold target as it comprises an untested, historical,
200m-long, north-striking, up to 7.3% copper2 and 8.8g/t gold3 rock chip sample geochemical
anomaly situated 200m east across strike from a yet to be resolved historical IP chargeability anomaly
and 400m south-west of historical end-of-auger-hole diamond core tails that intersected monzonite
which is the felsic intrusive lithology that hosts the Northparkes deposits.
Figure 1 – Map of the central New South Wales Lachlan Fold Belt showing the location of Adavale’s newly-acquired mineral
tenure relative to significant copper and gold deposits, the Lachlan Transverse Zone and Ordovician volcanic belts of the
Macquarie Arc Group. Note the Project’s proximity adjacent to the Northparkes mine at the intersection of the Lachlan
Transverse Zone with the Junee-Narromine Volcanic Belt.
2
Geopeko (A Division of Peko-Wallsend Operations Ltd). Report No. PK92/79S, First Annual Report on EL 3544, For the Period May 1990
- May 1991. (Geoscience NSW database [DIGS] report R0003275 [GS1993/055])
3
Meridian Minerals Ltd. EL6644, “North Parkes East”, Annual Report for the Period Ending on 9th October 2010, Lachlan Fold Belt Project,
NSW. (Geoscience NSW database [DIGS] report RE0002336 [GS2012/0015])
3
Table 1: Highlights from exploration prospects. Refer to referenced sources (WGS 84 / UTM Zone 55S)
Prospect
LondonVictoria4
Licence
Coordinates
Sample
EL7274
605450E, 6330000N
Drill core
Ashes2,3
EL8831
610609E, 6353745N
Rock chip
8.8g/t Au & 19.2 g/t Ag
610600E, 6353667N
Rock chip
5.5% Cu & 13.3 g/t Ag
610590E, 6353828N
Rock chip
1.5g/t Au, 84g/t Ag & 2.1% Cu
610563E, 6329534N
Rock chip
7.3% Cu & 0.02g/t Au (approximate location)
Comment
Visual indicators of mineralisation, assays
pending (drillhole AEIDD001)
Myalls3
EL8831
609113E, 6355834N
Rock chip
0.86% Cu & 0.91 g/t Au, veins in andesite
Corner5
EL8831
607550E, 6367900N
RAB
2m at 1.73 g/t Au, metaseds and intrusives
Parkvale6
EL8830
613613E, 6341984N
Rock chip
6.3 g/t Au, over magnetic anomaly
Cunich6
EL8830
613113E, 6335984N
Rock chip
1.4 g/t Au rock chips with elevated Cu
Birthday6
EL8830
607913E, 6329354N
Historic
11 g/t Au historic (pre-1900) grade
Figure 2 – Parkes Gold and Copper Project tenement location and prospect map.
Agricultural Equity Investments Pty Limited. Exploration Licence 7242, “Parkes”, Third Annual Exploration Progress Report, for the
period 7th November 2010 – 6th November 2011. (Geoscience NSW database [DIGS] report RE0002336 [GS2012/0015]).
5
Newmont Australia Ltd. EL7940, “Dunmore”, Annual Exploration Report for 2013, Appendix A Previous Work. (Geoscience NSW
database [DIGS] report RE0004378 [GS2013/0854]).
6
Agricultural Equity Investments Pty Limited. EL8830, First Annual Exploration Report, “About 4.84km NE of Parkes Project”, Covering
Period 13 April 2019 to 12 April 2020. (Geoscience NSW database [DIGS] report RE0012838 [GS2020/0571]).
4
4
London-Victoria Gold Mine – November 2024 Diamond Drilling
An angled 453m-long diamond core hole (AEIDD001) was drilled by the Vendor in November 2024
to test the down-dip depth potential of the London-Victoria gold deposit. The hole targeted the deposit
approximately 250m below surface and 150m below the bottom of the pit.
The hole intersected a prospective 12m-wide zone of quartz-carbonate veining and shearing in pyritesericite altered andesitic volcanoclastic rock from 339m to 351m. The intercept is broadly consistent
with the geology, thickness, structure and alteration assemblage, exhibited by the ore that was mined
at the bottom of the London-Victoria pit by BHP Gold and Hargraves in the 1980’s and 1990’s.
The drill core appears to be mineralised however no inferences can be drawn from these observations
about the gold grade of this intersection at present. Assay results for AEIDD001 are pending and will
be reported in full by Adavale as soon as they become available.
Figure 3 displays a satellite image showing AEIDD001’s location relative to the London-Victoria pit. A
photo of the drill core from the potential down-dip extension interval of the London-Victoria deposit
intersected in AEIDD001 is provided in Figure 4.
Figure 3 – Satellite image of the historic London-Victoria pit showing AEIDD001’s collar location and drillhole trace.
5
Figure 4 – Photo of core trays 107 and 108 from DDH AEIDD001 (344.97-351.63m) showing most of the 12m-thick zone of
quartz-carbonate veining and shearing in sericite-pyrite altered andesitic volcanoclastic rock intersected 339 to 351m
downhole, which is thought to be the down-dip extension of the London-Victoria deposit. Core tray length is 1m.
6
Uranium Projects (SA)
Following the acquisition of EL6553 from Kilonova Metals Pty Ltd, the Company has completed the
required heritage clearance survey to enable infill and extensional drilling of broad spaced historical
uranium drill intercepts at MacDonnell Creek. Final approval for the drill program is expected shortly.
This is an important step in Adavale’s planned Aircore drilling program at MacDonnell Creek and for
further potential paleochannel extensions within the Marree Embayment in South Australia.
Figure 5: Adavale’s recent heritage survey areas cleared at MacDonnell Creek, South Australia.
Adavale’s 2,000m Aircore program at MacDonnell Creek will be the first drilling at this prospect since
2011. The paleochannel at MacDonnell Creek is dominated by oxidised sands with the highest-grade
uranium mineralisation located in interbedded reduced sands and clays at the bottom of the channel.
The initial drill program will primarily target extensions of the known mineralisation both up and down
stream as well as minor infilling about the historical drill holes. (refer Figure 5).
Adavale’s 100% owned tenure in the Marree Embayment now makes it one of the largest public-listed
licence holders in the region (refer Figure 6). In previous quarter, the Company has also applied for a
large uranium project area east of Ceduna in South Australia, covering 2,446km2. During the quarter,
these tenements were granted bringing the total Company holding to approximately 4,959km2.
7
Figure 6: Adavale’s expanded Exploration Licence areas in the Marree Embayment South Australia.
In July 2024, Adavale executed a binding Heads of Agreement with Pinnacle Minerals Limited (ASX:
PIM) to acquire 100% of its uranium rights on the Wirrulla Project in South Australia.
Following announcing acquisition of the Parkes Project in November 2024, the Company has decided
not to proceed with the acquisition of the uranium rights of the Wirrulla Project.
Indicative Exploration Schedule
8
NICKEL EXPLORATION
Kabanga Jirani Nickel Project and Luhuma Nickel Project (Tanzania)
No significant exploration activities were undertaken during the quarter. The Company continues to
plan for a resumption of exploration activities once the nickel market recovers.
Corporate
During the quarter, Mr. Allan Ritchie transitioned to Executive Chairman on 31 October 2024 following
the resignation of Mr. David Riekie as Executive Director.
In conjunction with the acquisition of the Parkes Project, Adavale received binding commitments to
raise $1.675 million (before costs) through a placement to new and existing sophisticated and
professional investors.
The Company issued 670,000,000 fully paid ordinary shares at an issue price of $0.0025 per share.
Each Placement Share received 1 free attaching Option with an exercise price of $0.005 each expiring
31 December 2027 (“Attaching Options”).
The first Tranche of the Placement was issued under the ASX Listing Rule 7.1 and 7.1A in December
2024 and the remaining of the Placement together with the free Attaching Options were completed in
January 2025.
Directors and management participated on the same terms of the Placement for $95,000.
Proceeds from the Placement will be used to accelerate exploration activities within the Parkes Gold
and Copper Project with a primarily focus on increasing and upgrading the London-Victoria resource
to JORC-qualifying status. Proceeds will also be used for Adavale’s maiden drilling program (aircore)
at MacDonnell and George Creek prospects in South Australia for uranium.
Summary of Cashflow for the Quarter
Adavale held cash reserves at the end of the quarter of approximately $356,000.
During the quarter, approximately $97,000 was paid to directors and officers. Included in the amount
$76,000 (as shown at 6.1), was paid to directors in accordance with their standard employment
agreements. During the quarter, Directors participated in the placement totaling $33,500 as
announced on 31 July 2024 following receiving shareholder approval in October 2024.
The Company spent approximately $433,000 on exploration and evaluation activities as per the table
below:
Project
Nature of expenses
Kabanga and Luhuma Nickel Project
Project administration and compliance expenses
Field expenses
Geology consultants, field workers and other staff salaries
Travel expenses
Sub-total
Uranium Projects (South Australia)
Tenement management fees
Geological services
Heritage survey
Tenement rental rates
Sub-total
Amount $
24,000
20,000
58,000
2,000
104,000
4,000
57,000
54,000
69,000
184,000
9
Parkes Gold and Copper Project
Acquisition costs
Geological services
Drilling costs
40,000
7,000
98,000
145,000
TOTAL EXPLORATION AND EVALUATION EXPENDITURE
$433,000
This announcement is authorised for release by the Board of Adavale Resources Limited.
Further information:
Allan Ritchie
Executive Chairman and CEO
Adavale Resources
E: investor@adavaleresources.com
P: +61 2 8003 6733
Jane Morgan
Media and Investor Inquiries
Jane Morgan Management
E: jm@janemorganmanagement.com.au
P: +61(0) 405 555 618
Competent Persons Statement
The information in this release that relates to “exploration results” for the Uranium Projects is based on
information compiled or reviewed by Mr Patrick Harvey MAppSci, Australia. Mr Harvey is a consultant for
Adavale Resources Limited and is a member of the AIG. Mr Harvey has sufficient experience that is relevant to
the style of mineralisation and type of deposits under consideration as well as to the activity that is being
undertaking to qualify as a Competent Person under the ASX Listing Rules. Mr Harvey consents to this release
in the form and context in which it appears.
The information in this report that relates to Exploration Results and Historical Estimates on the Parkes Gold
and Copper Project is based on information compiled or reviewed by Stephen Burke, a Competent Person who
is a Member of the Australian Institute of Geoscientists. Stephen is employed by Burke Geoscience Pty. Ltd. as
a consultant to Adavale Resources Limited. He has sufficient experience that is relevant to the styles of
mineralisation and types of deposits under consideration and to the activity being undertaken to qualify as a
Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results,
Mineral Resources and Ore Reserves’ (the ‘JORC Code’). Stephen consents to the inclusion in the report of the
matters based on his information in the form and context in which it appears.
ASX Announcements References
1 October 2024: Heritage Survey completed for Uranium Drilling in SA
24 October 2024: Executive Changes
29 November 2024: Transformational Gold and Copper Project Acquisition
28 January 2025: Completion of Placement, Parkes Acquisition and Site Visit
The company confirms that it is not aware of any new information or data that materially affects the information
included in the original market announcements. The Company confirms that the form and context in which the
Competent Person’s findings are presented have not been materially modified from the original market
announcement.
10
Tenement Holdings and Movements
Schedule of Mining Tenements and Beneficial Interests
Held as at the end of the December 2024 Quarter
Project/Location
Country
Kabanga Jirani Nickel Project
Tanzania
Luhuma Nickel Project
Tanzania
Percentage
held/earning
Kabanga West (PL11590/2021)
100%
Kabanga North (PL 11405/2020)
100%
Kabanga North East (PL 11406/2020)
100%
Kabanga East (PL 11591/2021)
100%
Ruiza NE (PL 11592/2021)
100%
Burigi Block (PL11538/2021)
100%
Burigi North (PL11537/2021)
100%
Kabanga South East (PL11886/2022)
100%
Southeast Wedge (PL12175/2023)
100%
Luhuma Central (PL12350/2023)
100%
Tenement
PL11692
PL11693
65%
65%
The Company entered into a Farm-In Agreement to earn up to 100% of the Luhuma Nickel Project. The Company
currently has achieved a 65% interest in the project on 8 February 2023.
Nachingwea Prospect
Tanzania
PL11887/2022
100%
Lake Surprise Uranium Project
Australia
EL5892
EL5893
EL6598
100%
Maree Embayment Uranium
Project
Australia
EL6821
EL6957
EL6890
100%
MacDonnell/George Creek
Uranium Project
Australia
EL6533
100%
Narlaby and Tolmer Uranium
Project
Australia
EL7014
EL7024
EL7026
EL7025
100%
Acquired during the December 2024 Quarter
Project/Location
Narlaby and Tolmer Uranium
Project
Country
Tenement
Australia
EL7014
EL7024
EL7026
EL7025
Granted/
Acquired Date
October 2024
December 2024
December 2024
December 2024
Disposed of during the December 2024 Quarter
Project/Location
Country
Tenement
Withdrawal
Date
Nil
11
ABOUT ADAVALE RESOURCES
Exploring for Gold and Copper in the NSW Lachlan Fold Belt, Uranium in South Australia, and
Nickel Sulphide in Tanzania.
The Parkes Project
Adavale Resources Limited (ASX:ADD)
holds a 72.5% interest in the Parkes Gold
and Copper Project, consisting of four
granted exploration licences that are
highly prospective for Au-Cu, primarily
due to their location adjacent the giant
Northparkes copper-gold mine and
encompassing the Ordovician-aged rocks
of the Macquarie Arc, within the crustalscale structure of the Lachlan Transverse
Zone (LTZ) that contain both Northparkes
and the world-class Cadia gold-copper
Mine.
South Australian Uranium Portfolio
Adavale also holds seven granted
exploration licences that are prospective
for their sedimentary uranium potential
within the northern part of the highlyprospective Northern outwash from the
Flinders Ranges in South Australia, as
well as four exploration licences east of
Ceduna on the Eyre Peninsula,
increasing Adavale’s uranium tenement
holdings including to include uranium
rights to 4,959km2.
The Kabanga Jirani Nickel Project
Adavale also holds the Kabanga Jirani
Nickel Project, a portfolio of twelve highly
prospective granted licences along the
Karagwe-Ankolean belt in Tanzania. The
nine southernmost licences are proximal
to the world class Kabanga Nickel Deposit
(87.6Mt @ 2.63% Ni Eq). Adavale holds
100% of all licences except for two
licences that are known as the LuhumaFarm-in, which are held at 65%, adding a
further 99km2 and bringing the portfolio to
1,315km2. Adavale’s licences were
selected
based on their
strong
geochemical and geophysical signatures
from the previous exploration undertaken
by BHP.
12
Rule 5.5
Appendix 5B
Mining exploration entity
quarterly cash flow report
Name of entity
ADAVALE RESOURCES LIMITED
ABN
Quarter ended (“current quarter”)
96 008 719 015
31 December 2024
Consolidated statement of cash flows
Current quarter
$A’000
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
Year to date (6
months)
$A’000
-
44
(433)
(645)
(b) development
-
-
(c) production
-
-
(d) staff costs
(97)
(195)
(e) administration and corporate costs
(93)
(223)
(a) exploration & evaluation
1.3
Dividends received (see note 3)
-
-
1.4
Interest received
-
-
1.5
Interest and other costs of finance paid
-
-
1.6
Income taxes paid
-
-
1.7
Government grants and tax incentives
-
-
1.8
Other (GST (Paid)/Received)
(19)
(9)
1.9
Net cash from / (used in) operating
activities
(642)
(1,028)
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
(a) entities
-
-
(b) tenements
-
(20)
(c) property, plant and equipment
-
-
(d) exploration & evaluation
-
-
(e) investments
-
-
(f)
-
-
other non-current assets
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
2.2
Current quarter
$A’000
Year to date (6
months)
$A’000
Proceeds from the disposal of:
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
-
(d) investments
-
-
(e) other non-current assets
-
-
2.3
Cash flows from loans to other entities
-
-
2.4
Dividends received (see note 3)
-
-
2.5
Other (provide details if material)
-
-
2.6
Net cash from / (used in) investing
activities
-
(20)
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
763
1,238
3.2
Proceeds from issue of convertible debt
securities
-
-
3.3
Proceeds from exercise of options
-
-
3.4
Transaction costs related to issues of equity
securities or convertible debt securities
(76)
(101)
3.5
Proceeds from borrowings
110
110
3.6
Repayment of borrowings
(110)
(110)
3.7
Transaction costs related to loans and
borrowings
-
-
3.8
Dividends paid
-
-
3.9
Other (provide details if material)
(13)
(13)
3.10
Net cash from / (used in) financing
activities
674
1,124
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
324
280
4.2
Net cash from / (used in) operating
activities (item 1.9 above)
(642)
(1,028)
4.3
Net cash from / (used in) investing activities
(item 2.6 above)
-
(20)
4.4
Net cash from / (used in) financing activities
(item 3.10 above)
674
1,124
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 2
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
Current quarter
$A’000
Year to date (6
months)
$A’000
4.5
Effect of movement in exchange rates on
cash held
(1)
(1)
4.6
Cash and cash equivalents at end of
period
355
355
5.
Reconciliation of cash and cash
equivalents
Current quarter
$A’000
Previous quarter
$A’000
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
5.1
Bank balances
355
324
5.2
Call deposits
-
-
5.3
Bank overdrafts
-
-
5.4
Other (provide details)
-
-
5.5
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
355
324
6.
Payments to related parties of the entity and their
associates
6.1
Aggregate amount of payments to related parties and their
associates included in item 1
76
6.2
Aggregate amount of payments to related parties and their
associates included in item 2
-
Current quarter
$A'000
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 3
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
7.
Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
-
-
250
75
7.1
Loan facilities
7.2
Credit standby arrangements
7.3
Other (Convertible Notes)
-
-
7.4
Total financing facilities
250
75
7.5
Unused financing facilities available at quarter end
7.6
Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as well.
175
Standby Subscription Agreement
The unsecured facility arrangement with LKC Technology Pty Ltd (LKC) is a 5-year
agreement for $250,000 as announced on 29 April 2020, with $175k undrawn currently.
LKC subscribes for shares upon the Company issuing a drawdown notice. Fully paid ordinary
shares are issued at 80% of the 5-day VWAP that precedes the drawdown notice. No interest
rate applicable to this facility.
$A’000
8.
Estimated cash available for future operating activities
8.1
Net cash from / (used in) operating activities (item 1.9)
8.2
(Payments for exploration & evaluation classified as investing
activities) (item 2.1(d))
8.3
Total relevant outgoings (item 8.1 + item 8.2)
(642)
8.4
Cash and cash equivalents at quarter end (item 4.6)
355
8.5
Unused finance facilities available at quarter end (item 7.5)
175
8.6
Total available funding (item 8.4 + item 8.5)
530
8.7
Estimated quarters of funding available (item 8.6 divided by
item 8.3)
0.82
(642)
-
Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as “N/A”.
Otherwise, a figure for the estimated quarters of funding available must be included in item 8.7.
8.8
If item 8.7 is less than 2 quarters, please provide answers to the following questions:
8.8.1
Does the entity expect that it will continue to have the current level of net operating
cash flows for the time being and, if not, why not?
Yes.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 4
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
8.8.2
Has the entity taken any steps, or does it propose to take any steps, to raise further
cash to fund its operations and, if so, what are those steps and how likely does it
believe that they will be successful?
As announced on 29 November 2024, the Company has successfully received firm
commitments to raise $1.675m via a Placement to professional and sophisticated investors.
Tranche 1 was completed during the quarter and the balance of approximately $687,000
(Tranche 2) was completed in January 2025.
The current cash balance will be sufficient to fund the Company’s operations.
8.8.3
Does the entity expect to be able to continue its operations and to meet its business
objectives and, if so, on what basis?
Yes as per above 8.8.2.
Note: where item 8.7 is less than 2 quarters, all of questions 8.8.1, 8.8.2 and 8.8.3 above must be answered.
Compliance statement
1
This statement has been prepared in accordance with accounting standards and policies which
comply with Listing Rule 19.11A.
2
This statement gives a true and fair view of the matters disclosed.
Date:
31 January 2025
Authorised by: The Board of Directors of Adavale Resources Limit
Share your feedback
Discover