Strategic Acquisition to Expand Uranium Portfolio in SA
Released
Released
Announcement PDF
ASX ANNOUNCEMENT / MEDIA RELEASE
ASX:ADD
26 March 2024
Strategic licence acquisition to expand uranium portfolio
in South Australia
•
Acquisition of 100% interest in EL6553 increasing Adavale’s Uranium licence holdings to
2,058km2
•
EL6553 covers 456km2 and is proximal to the Company’s Mundowdna South and Lake
Surprise Uranium Project licences
•
Historical exploration on EL6553 identified numerous anomalous uranium target areas
including drill intercepts1:
o
1.0 metre at 263ppm eU3O8 and
o
0.65m at 235ppm eU3O8.
•
EL6553 covers the Eyre and Namba Formations where sedimentary roll-front uranium
deposits are known to form including the nearby Beverley and Honeymoon uranium
deposits
•
Area of Adavale’s exploration focus will centre around the pathfinder uranium results
previously achieved at MacDonnell Creek and Geoge Creek prospects
•
Field exploration activities will commence in April, over the prospective palaeochannel
system identified at the Mundowdna Uranium Project area
•
Adavale has reduced its debt position from $580k to $330k following repayment of 25
Convertible Notes at its maturity date
Adavale Resources Limited (ASX: ADD) (“or the Company”) is pleased to advise that it has
expanded its Uranium portfolio in South Australia with the proposed acquisition of 100% interetes in
EL6553. The EL is a strategically significant tenement, comprising two areas located adjacent to and
east of both the Company’s existing Mundowdna South and Lake Surprise project areas, respectively.
Adavale has entered into a binding Heads of Agreement (HoA) with Kilonova Metals Pty Ltd to acquire
EL6553. Refer to Appendix 1 for the summary key terms of the HoA.
Adavale’s Executive Director, David Riekie commented:
Following the recent acquisition of a significant historical EM dataset and extensive reprocessing
over our Mundowdna South EL, the Company has been assessing a variety of strategic and
proximal acquisitions that have demonstrated potential to host similar prospective palaeochannel
systems. We consider this acquisition represents an exciting opportunity for the Company in that
it has demonstrated palaeochannels containing ample evidence of elevated uranium
occurrences. We also believe the area to be under-explored as the initial exploration of the area
was abruptly halted following the Fukushima incident in Japan in 2011. We can now capitalise on
this earlier exploration and follow up on these clearly defined targets. We see this as a huge boost
to our upcoming 2024 uranium exploration programs.”
1
Refer to CXU ASX announcement dated 14 July 2011– “Maree Drilling Results”
Directors & Officers
GRANT PIERCE
ALLAN RITCHIE
Chairman
CEO
DAVID RIEKIE
LEONARD MATH
Executive Director
CFO & Company Secretary
JOHN HICKS
Non-Executive Director
Adavaleresources
ASX: ADD
adavaleresources.com
AdavaleL
investor@advaleresources.com
+61 2 8003 6733
Adavale Resources Limited
Level 2, 49 Oxford Close
West Leederville, WA, 6007
Exploration Licence 6553
EL6553 covers 456km2 across two parts, with the first part (to be called ‘Mundowdna South East’)
adjacent to Mundowdna South and the other portion (‘MacDonnell Creek’) to the east of the
Company’s Lake Surprise Uranium Project.
The acquisition lifts Adavale’s 100% owned tenure to 2,058km2, making it one of the largest publiclisted licence holders in the region. See Figure 1.
Figure 1: Exploration Licence areas for Adavale (blue) and Kilonova’s EL6553 (red) over 2 separate Licence area
The regional interest in the uranium potential about the northern Flinders Ranges is significant and is
reflected by the extensive licence coverage of the region (Figure 2).
ASX Announcement
2
Figure 2: Summary of localised Licence ownership and underlying geology located around the northern Flinders Ranges
Geology - Technical
The MacDonnell Creek and Mundowdna South East are proximal to the uranium-rich Mount Babbage
and Mount Painter Inliers of the northern Flinders Ranges. Both areas contain the very prospective
Paleogene-aged Eyre and Neogene-aged Namba Formations which are the host to several
sedimentary roll-front uranium occurrences including the Beverley, Beverley Four Mile, and
Honeymoon Well uranium mines. These formations are the principal target for uranium mineralisation
within the Project areas. Historical exploration drilling and heliborne electromagnetic surveys
completed by Cauldron Energy Limited (ASX:CXU) (Cauldron) in the late 2000s suggests the
presence of significant palaeochannel sand sequences trending through the Project area.
Underlying the Eyre and Namba Formations and outcropping in places are upper Mesozoic (Maree
Subgroup) sediments. To the south these sequences abut Proterozoic Wilpena and Umberatana
(Adelaidean) groups outcrops of the Flinders Ranges.
ASX Announcement
3
Previous Exploration
MacDonnell Creek
In August 2008, Cauldron undertook an initial mud rotary drilling program at MacDonnell Creek
targeting uranium mineralisation within Eyre Formation sands adjacent to a basement intersecting
fault system. A total of19 vertical mud rotary holes were drilled for a total of 2,486 metres. The holes
were generally drilled on at 800m spacing with lines 1200m apart and were logged with a Geovista
gross gamma downhole tool, which recorded a maximum elevation of 61ppm eU308 over 0.5m in hole
MAMR006.2
In 2009, Cauldron entered into a Farm-In and Joint Venture Agreement with a Korean Consortium
comprising the Korean government (KORES), Daewoo, and LG to jointly explore, drill and develop
what was called the Marree Uranium Project. The MacDonnell Creek tenure (EL6553) overlies the
central and eastern part of Cauldron’s earlier tenure.
In July 2011, Cauldron completed additional drilling programs at MacDonnell Creek (Figure 3) and
George Creek (Figure 4). In total, 33 (MAMR120-152) vertical drillholes (3,576 metres) were drilled
on a 200m x 100m pattern at MacDonnell Creek and 1,000m x 500m pattern at George Creek. The
drilling generally intersected similar thicknesses and lithologies of Namba and Eyre Formations as
were intersected from previous drilling campaigns, indicating the dominantly depositional nature of
the sedimentary package in the MacDonnell Creek area.3
Figure 3: MacDonnell Creek drilling by Cauldron up to 2011 (Source: CXU 2011 Annual Report)
2
3
Refer to SIM ASX announcement dated 28 October 2008 – “Maree Project Update”
Refer to CXU ASC announcement dated 14 July 2011 – “Maree Drilling Results”
ASX Announcement
4
Figure 4: George Creek and MacDonnell Creek prospects identified by Cauldron (within the new MacDonnell Creek tenure)
(Source: CXU 2011 Annual Report)
The MacDonnell Creek drilling (21 holes for 2,442m, MAMR120-MAMR140) identified a major new
uranium-bearing, palaeochannel located within an extensive sedimentary package high in anomalous
uranium. The channel, which is trending to the east, is up to 300m wide and 12m deep and has been
generated as a result of regional faulting to the west of the drilling area (Figure 4).
The drilling returned the project’s best uranium intercepts, with downhole gamma probing returned a
maximum intersection of 1.0 metre at 263ppm eU3O8 and 0.65 metres at 235ppm eU3O8 in reduced
sediments directly below the channel itself (Figure 3 and Figure 4)3.
Seven of the drillholes intercepted the palaeochannel, with four of these (MAMR 132-135) containing
significant uranium intercepts.
There is an extensive zone of elevated uranium that occurs throughout the Eyre Formation units within
the drilling area. Large volumes of uranium appear to have migrated along a localised fault and have
moved through the permeable sand units within an approximate one kilometre radius. Within a
thickness of approximately 25 metres of Eyre Formation interbedded sand and clay units, there are
numerous permeable zones for uranium to move into as seen by the broad zone of elevated uranium
identified in many of the recent drillholes. The channel itself directly crosses the fault where uranium
has migrated along as well as passing through the zone of elevated uranium and appears to have
acted as a preferred pathway for uranium migration.
Evidence that uranium is moving through the channel comes from the fact there is often a thin zone
of elevated uranium located within the underlying interbedded reduced sand and clay unit. Uranium
has moved from within the channel itself, which is highly oxidized, into the more reduced sediments
below. The highest grade intersections identified from drilling at MacDonnell Creek was 1.0 metre at
ASX Announcement
5
263ppm eU3O8 from 107.6m, in hole MAMR132 and 0.65m at 235ppm eU3O8 from 105.7m, in hole
MAMR134.3
Further to the west, drilling at George Creek (12 holes for 1,134m) returned significant anomalous
uranium mineralisation associated with a deepening of the sedimentary sequences towards an
embayment in a regional scale fault system. A region of anomalous uranium mineralisation was
centred around MAMR149, which returned a maximum intersection of 0.95m at 136ppm eU3O8 within
variable oxidised and reduced sands and clays of the interpreted Eyre Formation (Figure 3).3
The uranium mineralisation at MacDonnell Creek and George Creek are located at redox boundaries
within sediments of Eyre and Namba Formations. The full extent of the MacDonnell Creek and George
Creek mineralisation are yet to be determined and as such will form the principal focus of Adavale’s
exploration effort over the area.
Mundowdna South East
In 1973, Nissho-iwai (Australia) Pty Ltd completed a regional exploration program of mapping, rock
chip sampling and drilling for uranium minerals within an area that covers Mundowdna South East.
Several anomalous uranium target areas were highlighted but not extensively followed up.
Vendors
The vendors of EL6553, Mr Terry Topping and Mr Andrew Rust are both experienced geologists and
previously held executive and management roles with Cauldron Energy during its exploration phase
in this region. They have extensive experience in the exploration and discovery of uranium deposits
and a deep understanding of the northern Flinders Ranges geology and the controls on mineralisation
in the region.
Adavale has access to Messrs Topping and Rust to assist with the development of the Company’s
upcoming uranium exploration plans.
Next Steps
•
•
•
•
•
•
•
Completion of data review on EL6553 provided by Kilonova
Confirmation of target areas on EL6553 followed by preparation of an exploration program
Commencement of Exploration program on Mundowdna uranium Project (April)
Land access and notice of entry forms for EL6553
Delineation of extensions to the prospective areas - soil sampling/surface sampling to refine
drill targets
Prepare drill program in conjunction with cultural surveys/submissions of EPEPR and
associated statutory documents
Drilling programs to determine uranium mineralisation potential (EL6553/Mundowdna)
This announcement is authorised for release by the Board of Adavale Resources Limited.
Acknowledgements to traditional owners
Adavale acknowledges the Dieri and Adnyamathanha as Traditional Custodians of the land on which
our current works are located. With respect to Elders past, present and emerging, Adavale is
committed to conducting its activities with respect to the communities in which it operates.
Refer to CXU ASC announcement dated 14 July 2011 – “Maree Drilling Results”
3
ASX Announcement
6
Further information:
For broker and media enquiries:
David Riekie
Executive Director
E: investor@adavaleresources.com
P: +61 2 8003 6733
Andrew Rowell
White Noise Communications
E: andrew@whitenoisecomms.com
P: +61 400 466 226
Competent Persons Statement
The information in this release that relates to “exploration results” for the Project is based on information
compiled or reviewed by Mr Patrick Harvey MAppSci, Australia. Mr Harvey is a consultant for Adavale Resources
Limited and is a member of the AIG. Mr Harvey has sufficient experience that is relevant to the style of
mineralisation and type of deposits under consideration as well as to the activity that is being undertaking to
qualify as a Competent Person under the ASX Listing Rules. Mr Harvey consents to this release in the form and
context in which it appears.
Forward looking statements
This document contains forward-looking statements concerning Adavale. Forward-looking statements are not
statements of historical fact and actual events and results may differ materially from those described in the
forward-looking statements as a result of a variety of risks, uncertainties and other factors. Forward-looking
statements are inherently subject to business, economic, competitive, political and social uncertainties and
contingencies. Many factors could cause the Company’s actual results to differ materially from those expressed
or implied in any forward-looking information provided by the Company, or on behalf of the Company. Such
factors include, among other things, risks relating to additional funding requirements, metal prices, exploration,
development and operating risks, competition, production risks, regulatory restrictions, including environmental
regulation and liability and potential title disputes.
Forward looking statements in this document are based on Adavale’s beliefs, opinions and estimates of Adavale
as of the dates the forward-looking statements are made, and no obligation is assumed to update forward looking
statements if these beliefs, opinions and estimates should change or to reflect other future developments.
Although management believes that the assumptions made by the Company and the expectations represented
by such information are reasonable, there can be no assurance that the forward-looking information will prove
to be accurate. Forward-looking information involves known and unknown risks, uncertainties, and other factors
which may cause the actual results, performance or achievements of the Company to be materially different
from any anticipated future results, performance or achievements expressed or implied by such forward-looking
information. Such factors include, among others, the actual market price of nickel, the actual results of future
exploration, changes in project parameters as plans continue to be evaluated, as well as those factors disclosed
in the Company's publicly filed documents. Readers should not place undue reliance on forward-looking
information. The Company does not undertake to update any forward-looking information, except in accordance
with applicable securities laws. No representation, warranty or undertaking, express or implied, is given or made
by the Company that the occurrence of the events expressed or implied in any forward- looking statements in
this document will actually occur.
ASX Announcement
7
ABOUT ADAVALE – Uranium and Nickel Sulphide Explorer
Adavale Resources Limited (ASX:ADD) holds the Kabanga Jirani Nickel Project, a portfolio of 12 highly
prospective granted licences along the Karagwe-Ankolean belt in Tanzania. The 9 southernmost licences are
proximal to the world-class Kabanga Nickel Deposit (87.6Mt @ 2.63% Ni Eq). Adavale holds 100% of all
licences except 2 licences known as the Luhuma-Farm-in are held 65% adding a further 99km2 bringing the
portfolio to 1,315sq km). Adavale’s licences were selected based on their strong geochemical and geophysical
signatures from the previous exploration undertaken by BHP.
Adavale also holds 5 granted exploration licences prospective for their sedimentary uranium potential within the
northern part of the highly prospective Northern outwash from the Flinders Ranges in South Australia. ADD is
in the process of acquiring an additional exploration licence EL6553 (456km2) to increase this strategic holding
to 2,058km2.
ASX Announcement
8
Appendix 1 – Material Terms of Binding Heads of Agreement
Acquisition
Adavale Resources Limited (ASX:ADD) (ADD) agrees to acquire and Kilonova Metals
Pty Ltd (Kilonova) agrees to sell all of its rights, title and interest in exploration
licence, EL6553 (Tenement).
Consideration
The consideration comprises;
a) A$15,000 non-refundable deposit (Deposit);
b) 25,000,000 ADD shares (at a deemed price of $0.005 per
share)(Consideration Shares) subject to shareholder approval;
c) Deferred Consideration of 25,000,000 ADD shares payable upon Adavale
completing a maiden drilling program and returning an intercept of a minimum
of 1m combining to at least 10m at 0.05% U3O8 by 31 December 2025
(Deferred Consideration Shares).
Conditions
Precedent
Completion of the Acquisition is conditional upon the satisfaction (or waiver by ADD)
of the following Conditions Precedent:
•
completion of financial, legal and technical due diligence by ADD on the
Tenement, to the absolute satisfaction of ADD within 30 days of the date of
the agreement;
•
the Parties obtaining all necessary regulatory approvals or waivers pursuant
to the ASX Listing Rules, Corporations Act 2001 (Cth) or any other applicable
law by 31 July 2024;
•
the Parties obtaining all third party approvals and consents, including the
consent of the Minister responsible for the Mining Act 1971 (SA) and
associated Mining Regulations 2020 (SA) by 31 July 2024; and
•
ADD obtaining all necessary Shareholder approvals including approval for
the issue of the Consideration Shares by 31 July 2024.
A party may terminate this agreement by written notice to the other party if the
conditions precedent are not satisfied (or waived by ADD) on or before 5pm (Perth
time) on 31 July 2024 (or such later date as the Parties may agree).
The binding heads of agreement is otherwise on standard terms and conditions, including confidentiality
provisions, and representations and warranties.
ASX Announcement
9
Appendix 2 – Drillhole Locations
Tenement
Hole ID
EL4609
MAMR120
EL4609
MAMR121
EL4609
MAMR12.2
EL46C9
MAMR123
EL4609
MAMR124
EL4609
MAMR125
EL4609
MAMR126
EL46æ
MAMR127
EL4609
MAMR128
EL4609
MAMR129
EL4609
MAMR130
EL4609
MAMR131
EL46CA
MAMR132
EL4609
MAMR133
EL4609
MAMR134
EL4609
MAMR135
EL4609
MAMR136
EL4609
MAMR137
EL4609
MAMR138
EL4609
MAMR139
EL4609
MAMR140
EL4610
MAMR141
EL4610
MAMR142
EL4610
MAMR143
EL4610
MAMR144
EL4610
MAMR145
EL4610
MAMR146
EL4610
MAMR147
EL4610
MAMR148
EL4610
MAMR149
EL4610
MAMR150
EL4610
MAMR151
EL4610
MAMR152
Easting
350998
35141.2
351654
351000
351196
351196
351288
351401
352512
351600
351.209
350995
351197
350793
3512.96
351354
351202
351005
350608
35081.2
350502
341602
342646
343593
342594
341632
340598
339646
339589
340613
341530
341103
340094
Northing
6730431
6730406
6730395
6730595
6730607
6730605
6730604
6730602
6730605
6730604
6730481
6730203
6730205
6730205
6730200
6730218
6730106
6730001
6729837
6729797
6729697
6725902
6725902
6725896
6725402
6725397
6725897
6725345
6724895
6724907
6724900
6724903
6724901
Depth
132
126
126
120
6
126
126
126
120
120
120
120
120
120
120
120
120
120
120
120
114
96
84
72
96
102
96
96
90
102
108
96
96
Dip
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
Azimuth
360
360
360
360
360
360
360
360
360
360
360
360
360
360
360
360
360
360
360
360
360
360
360
360
360
360
360
360
360
360
360
360
360
Date
Max U3O8
Drilled
ppm
5/03/2011
74
5/03/2011
206
7/03/2011
108
7/03/2011
160
21/05/2011 Not probed
21/05/2011
144
22/05/2011
126
24/05/2011
113
24/05/2011
48
25/05/2011
43
27/05/2011
170
27/05/2011
58
27/05/2011
355
28/05/2011
197
28/05/2011
431
29/05/2011
205
30/05/2011
86
30/05/2011
136
30/05/2011
249
31/05/2011
134
1/06/2011
213
1/06/2011
109
2/06/2011
25
2/06/2011
25
3/06/2011
29
4/06/2011
47
4/06/2011
56
5/06/2011
47
5/06/2011
82
5/06/2011
183
6/06/2011
109
6/06/2011
152
6/06/2011
146
(see CXU ASX announcement dated 14 July 2011 “Marree Drilling Results”)
ASX Announcement
10
Appendix 3 – Significant Intercepts
Hole ID
MAMR 121
MAMR 123
MAMR 125
MAMR 126
MAMR 130
MAMR 132
Prospect
MacDonnell
Creek
MacDonnell
Creek
MacDonnell
Creek
MacDonnell
Creek
MacDonnell
Creek
MacDonnell
Creek
MAMR133
MacDonnell
Creek
MAMR134
MacDonnell
Creek
MAMR 135
MAMR 137
MAMR 138
MAMR139
MAMR140
MAMR149
MAMR151
MAMR152
MacDonnell
Creek
MacDonnell
Creek
MacDonnell
Creek
MacDonnell
Creek
MacDonnell
Creek
George Creek
George Creek
George Creek
From
(metre)
To (metre)
Width
(metres)
eU3O8 ppm
Max U3O8
ppm
102.6
103.25
0.65m
175
206
98.55
98.85
0.3m
134
161
103.3
103.55
0.25m
129
144
102.5
102.7
0.2m
116
126
100.2
100.6
0.4m
135
170
107.6
109.3
1.7m
216
355
including
1.0m
263
355
101.2
101.65
0.45m
125
153
113.1
113.5
0.4m
157
196
105.7
106.35
0.65m
235
431
including
0.3m
342
431
108.5
109.1
0.6m
159
209
109.6
110.1
0.5m
150
205
103.05
103.45
0.4m
120
136
90.95
91.3
0.35
131
152
92.7
93.55
0.85m
164
249
92.9
93.1
0.2m
123
134
91.1
91.45
0.35m
167
214
93
93.45
0.45m
135
165
105.65
106
0.35m
129
156
79.3
83.4
68.5
80.25
83.85
68.7
0.95m
0.45m
0.2m
126
119
123
183
152
146
(see CXU ASX announcement dated 14 July 2011 “Marree Drilling Results”)
ASX Announcement
11
Appendix 4 – JORC Table 1
Adavale Resources Limited – Lake Surprise and Mundowdna
Projects, South Australia
JORC Code Edition 2012: Table 1
Section 1: Sampling Techniques and Data
Criteria
JORC Code Explanation
Commentary
Sampling
techniques
•
No Sampling or drilling has been
completed by Adavale Resources
Drilling
techniques
ASX Announcement
Nature and quality of sampling (eg cut channels,
random chips, or specific specialised industry
standard measurement tools appropriate to the
minerals under investigation, such as down hole
gamma sondes, or handheld XRF instruments,
etc). These examples should not be taken as
limiting the broad meaning of sampling.
•
Include reference to measures taken to ensure
sample representivity and the appropriate
calibration of any measurement tools or systems
used.
•
Aspects of the determination of mineralisation that
are Material to the Public Report. In cases where
‘industry standard’ work has been done this would
be relatively simple (eg ‘reverse circulation drilling
was used to obtain 1 m samples from which 3 kg
was pulverised to produce a 30 g charge for fire
assay’). In other cases more explanation may be
required, such as where there is coarse gold that
has inherent sampling problems. Unusual
commodities or mineralisation types (eg
submarine nodules) may warrant disclosure of
detailed information.
•
Drill type (eg core, reverse circulation, open-hole
hammer, rotary air blast, auger, Bangka, sonic,
etc) and details (eg core diameter, triple or
standard tube, depth of diamond tails, facesampling bit or other type, whether core is
oriented and if so, by what method, etc).
Historic drilling was completed
between 2008 and 2011 by
Cauldron Energy. Drilling was mud
rotary to a depth of 130m. Initial
holes at MacDonnell Creek were
drilled 800m apart along lines.
Lines were 1200m apart, with later
drilling infilling some areas to 400m
x 400m, 200m x 200m and some
200m x 100m in 2011. Initial drilling
at George Creek was on 1km x
1km spacings with later drilling
infilling some areas to 500m x
500m.
Holes were downhole gamma
logged by Borehole Wireline Pty Ltd
with a Geovista 38mm total count
gamma probe, which was
calibrated in Adelaide at the
Department of Water, Land and
Biodiversity Conservation in
calibration pits constructed under
the supervision of CSIRO.
The gamma tool measures the total
gamma ray flux in the drill hole.
Readings are averaged over 5
centimetre intervals and the
readings and depth were recorded
on a portable computer. The
gamma ray readings were
converted to equivalent U3O8
readings by using the calibration
factors derived from the Adelaide
calibration pits. These factors also
take into account differences in
hole size and water content.
The grade and calibration was
calculated by Borehole Wireline
based in South Australia. Grade
thickness intervals were calculated
by 3D Exploration Ltd based in
Western Australia.
Historic drilling by CXU was by open
hole rotary mud.
12
Criteria
JORC Code Explanation
Commentary
Drill sample
recovery
•
Method of recording and assessing core and chip
sample recoveries and results assessed.
•
Measures taken to maximise sample recovery and
ensure representative nature of the samples.
•
Whether a relationship exists between sample
recovery and grade and whether sample bias may
have occurred due to preferential loss/gain of
fine/coarse material.
2 metre composite samples for
geological logging were collected
from the open-hole drill collar, as
the drill cuttings were
lifted from the hole by the drilling
muds
The geological logging recorded
various geological parameters,
including lithology, colour, grain
size and reduction and oxidation
state.
Logging
Sub-sampling
techniques and
sample
preparation
Quality of
assay data and
laboratory tests
•
Whether core and chip samples have been
geologically and geotechnically logged to a level
of detail to support appropriate Mineral Resource
estimation, mining studies and metallurgical
studies.
•
Whether logging is qualitative or quantitative in
nature. Core (or costean, channel, etc)
photography.
•
The total length and percentage of the relevant
intersections logged.
•
If core, whether cut or sawn and whether quarter,
half or all core taken.
•
If non-core, whether riffled, tube sampled, rotary
split, etc and whether sampled wet or dry.
•
For all sample types, the nature, quality and
appropriateness of the sample preparation
technique.
•
Quality control procedures adopted for all subsampling stages to maximise representivity of
samples.
•
Measures taken to ensure that the sampling is
representative of the in-situ material collected,
including for instance results for field
duplicate/second-half sampling.
•
Whether sample sizes are appropriate to the grain
size of the material being sampled.
•
The nature, quality and appropriateness of the
assaying and laboratory procedures used and
whether the technique is considered partial or
total.
•
For geophysical tools, spectrometers, handheld
XRF instruments, etc, the parameters used in
determining the analysis including instrument
make and model, reading times, calibrations
factors applied and their derivation, etc.
•
ASX Announcement
Nature of quality control procedures adopted (eg
standards, blanks, duplicates, external laboratory
No relationship exists between
sample recovery and uranium
grade, as the grade is calculated
from a separate downhole gamma
tool.
Historic geological logging was
completed by Cauldron Energy from
drill chips derived from open hole
mud rotary methods. The drill
logging is being reviewed. All holes
were drilled vertically to a depths up
to 130m. All holes were geologically
logged and gamma logged using a
Geovista 38mm total count gamma
probe.
No historic geochemical subsampling was completed by CXU.
No historical geochemical analysis
was completed by CXU. All results
were derived from downhole gamma
logging utilising a Geovista 38mm
total count gamma probe.
All CXU holes were downhole
gamma logged by Borehole
Wireline Pty Ltd with a Geovista
38mm total count gamma probe,
which was calibrated in Adelaide at
the Department of Water, Land and
Biodiversity Conservation in
13
Criteria
JORC Code Explanation
checks) and whether acceptable levels of
accuracy (ie lack of bias) and precision have been
established.
Commentary
calibration pits constructed under
the supervision of CSIRO.
The gamma tool measures the total
gamma ray flux in the drill hole.
Readings are averaged over 5
centimetre intervals and the
readings and depth were recorded
on a portable computer. The
gamma ray readings were
converted to equivalent U3O8
readings by using the calibration
factors derived from the Adelaide
calibration pits. These factors also
take into account differences in
hole size and water content.
The grade and calibration was
calculated by Borehole Wireline
based in South Australia. Grade
thickness intervals were calculated
by 3D Exploration Ltd based in
Western Australia.
Verification of
sampling and
assaying
Location of
data points
Data spacing
and distribution
Orientation of
data in relation
to geological
structure
ASX Announcement
•
The verification of significant intersections by
either independent or alternative company
personnel.
•
The use of twinned holes.
•
Documentation of primary data, data entry
procedures, data verification, data storage
(physical and electronic) protocols.
•
Discuss any adjustment to assay data.
•
Accuracy and quality of surveys used to locate
drill holes (collar and down-hole surveys),
trenches, mine workings and other locations used
in Mineral Resource estimation.
•
Specification of the grid system used.
•
Quality and adequacy of topographic control.
•
Data spacing for reporting of Exploration Results.
•
Whether the data spacing, and distribution is
sufficient to establish the degree of geological and
grade continuity appropriate for the Mineral
Resource and Ore Reserve estimation
procedure(s) and classifications applied.
•
Whether sample compositing has been applied.
•
Whether the orientation of sampling achieves
unbiased sampling of possible structures and the
extent to which this is known, considering the
deposit type.
•
If the relationship between the drilling orientation
and the orientation of key mineralised structures is
Not applicable as early stages of
exploration. Work aimed at
identifying broader areas of
mineralisation and infill for
compliance and verification was to
follow in later programs.
Handheld GPS using GDA94 was
used by CXU to locate and record
drill collars.
Historic drilling was completed
between 2008 and 2011 by
Cauldron Energy. Initial holes at
MacDonnell Creek were drilled
800m apart along lines. Lines were
1200m apart, with later
Share your feedback
Discover