High-Grade Gold, Copper and Silver Rock Chips at Ashes
Released
Released
Announcement PDF
ASX ANNOUNCEMENT
26 February 2025
ASX: ADD
High-Grade Gold, Copper and Silver Rock Chips at Ashes
• Outstanding results reported at the Ashes Prospect in NSW, further demonstrating the
potential of the Prospect to host a Gold and Copper mineralised system ~10km east of
Northparkes (5.2 Moz Au & 4.4 Mt Cu) [ASX:EVN]
• First pass reconnaissance rock chip program yields high-grade gold, copper and silver
assay results at Ashes Prospect, highlights including:
o
7.95 g/t Au, 2.2% Cu & 96.4 g/t Ag – (P24654 – image below)
o
0.74 g/t Au, 0.76% Cu & 58.9 g/t Ag – (P24651)
o
0.32 g/t Au & 17.8 g/t Ag – (P24652)
• Assay results complement and confirm historical rock chip results at Ashes Prospect,
including:
o
8.8 g/t Au & 19.2 g/t Ag
o
5.5% Cu & 13.3 g/t Ag
o
1.5 g/t Au, 84 g/t Ag & 2.1% Cu
• Highly anomalous levels of pathfinder element (Sb) and anomalous (Mo) returned in
several samples which provide additional positive indication of mineralisation potential.
• Early reconnaissance by the Company also notes outcropping intrusive rocks of likely
Ordovician age including monzonite at Ashes Prospect.
• Mobilisation to Ashes and Myalls Prospects will soon be underway for a grid-based soil
geochemistry program with additional rock chip sampling over an area of ~5km2 .
Adavale Resources Limited (ASX:ADD) (“Adavale” or the “Company”) is pleased to announce
assay results from the first pass reconnaissance rock chip program at the Ashes Prospect (the
“Prospect”), located in the Lachlan Fold Belt of NSW, Australia.
Adavale Resources Executive Chairman and CEO, Mr Allan Ritchie, commented:
“The elevated grade of these latest assay results are a further testament to the quality of the prospects
that Adavale has recently acquired as part of the broader Parkes Project Transaction. We are excited at
the potential of the Ashes Prospect to host a Gold and Copper mineralised system. The field team will
soon be mobilised to site to commence with a much larger area soil geochemistry survey and further
rock chip sampling at the Ashes and Myalls Prospects. This regional exploration strategy to identify AuCu mineralised systems will continue and further surface geochemical surveys will be conducted across
the numerous prospects we have in the Parkes Project.”
Directors & Officers
Adavaleresources
ALLAN RITCHIE
NIC MATICH
Executive Chairman & CEO
Non-Executive Director
JOHN HICKS
Non-Executive Director
AdavaleL
Investors@adavaleresources.com
LEONARD MATH
CFO & Company Secretary
www.adavaleresources.com
+61 2 8003 6733
Adavale Resources Limited
Level 2, 49 Oxford Close
West Leederville, WA, 6007
\
Assay results (Appendix 1, Table 1) from the field trip undertaken on 24 January 2025. The assay
results complement historical, high-grade gold and copper rock chip results, and demonstrate the
potential of the Ashes Prospect to host a Cu-Au mineralised system hosted in Ordovician aged
volcaniclastics.
Highlights from the program include:
•
7.95 g/t Au, 2.2% Cu & 96.4 g/t Ag – (P24654)
•
0.74 g/t Au, 0.76% Cu & 58.9 g/t Ag – (P24651)
•
0.32 g/t Au & 17.8 g/t Ag – (P24652)
Historical results from the Prospect include:
•
8.8 g/t Au & 19.2 g/t Ag
•
5.5% Cu & 13.3 g/t Ag
•
1.5 g/t Au, 84 g/t Ag & 2.1% Cu
Figure 1: Sample P24654 and P24652
High-grade gold and copper samples also returned anomolous levels of pathfinder elements
Arsenic (As) up to 0.1% and highly significant Antimony (Sb) up to 0.24%. These pathfinder
elements, especially Sb, provide some high level emplacement indication for a gold-copper
mineralised system as noted from numerous other Eastern Australian and including Lachlan Fold
Belt mineral deposits.
In addition, initial reconnaissance work has established the presence of nearby intrusive rocks of
likely Ordovician age, including monzonite that will be investigated further during the upcoming
surface geochemistry program.
2
Figure 2: Map of rock chip locations
3
Figure 3: Sample P24654 with visible Malachite and Chalcopyrite
Geochemical Sampling Program – Ashes and Myalls Prospects
The Adavale team will very soon mobilise to Ashes and Myalls Prospects only a few kms due east
of Northparkes (5.2 Moz Au & 4.4 Mt Cu) [ASX:EVN] to conduct geological mapping and a grid-based
soil sampling program, with further rock chip sampling over an area of approximately 5km2 that
combines both prospects (Figure 4).
Figure 4: Proposed geochemistry sample locations
4
Adavale’s Parkes Project
Figure 5: Map of the central New South Wales Lachlan Fold Belt
The Parkes Project comprises four exploration tenements for a total area of 354.15km 2, within the
prolific gold and copper-producing Macquarie Arc portion of the Lachlan Fold Belt (NSW). These
are prospective for orogenic, epithermal and gold-rich porphyry-style copper-gold deposits.
The exploration licences are situated where Early Ordovician-aged Junee-Narromine Volcanic Belt
rocks of the western part of the Arc are intersected by the crustal-scale structural corridor of the
Lachlan Transverse Zone (“LTZ”). Significantly, the LTZ is host to Tier-1 gold and copper mines, such
as Northparkes (5.2Moz Au & 4.4Mt Cu) and Cadia Ridgeway (35.1Moz Au & 7.9Mt Cu) where it
intersects Macquarie Arc rocks (Figure 5).
The Parkes Project’s most advanced prospect is the former London-Victoria Gold Mine which saw
estimated historical production by BHP Gold and Hargraves Resources of 200,000 to 250,000
ounces at a head grade of 1.5-2g/t Au. A non-JORC Historical Estimate of 3.7Mt at 1.04 g/t Au for
123.8koz Au is defined for London-Victoria (refer to Cautionary Statement1 below).
At London-Victoria, it is intended to utilise the existing drillhole database with minimal additional
resource definition work to estimate a JORC Mineral Resource in the near future. This opportunity
comes at relatively low cost and at a time of record gold prices.
Cautionary Statement: Readers are cautioned that the Historical Estimate for the London-Victoria deposit referred to in this
Announcement is not reported in accordance with the JORC 2012 Code. A Competent Person has not undertaken sufficient work to classify
the Historical Estimate as a Mineral Resource in accordance with the JORC 2012 Code. Nothing has come to the attention of Adavale that
causes it to question the accuracy or the reliability of the former owner’s Historical Estimate. However, Adavale has not independently
validated the former owner’s estimate and therefore is not to be regarded as reporting, adopting or endorsing the estimate. Following
evaluation and further exploration work, it is uncertain whether it will be possible to report the Historical Estimate as a Mineral Resource
in accordance with the JORC 2012 Code. The Historical Estimate has been reported in accordance with ASX Listing Rule 5.12. Refer to ASX
announcement dated 29 November 2024 further information.
1
5
This announcement is authorised for release by the Board of Adavale Resources Limited.
Further information:
Allan Ritchie
Executive Chairman and CEO
Adavale Resources
E: investor@adavaleresources.com
P: +61 2 8003 6733
Jane Morgan
Media and Investor Inquiries
Jane Morgan Management
E: jm@janemorganmanagement.com.au
P: +61(0) 405 555 618
Forward Looking Statements
Certain statements in this announcement are or may be “forward-looking statements” and
represent Adavale’s intentions, projections, expectations, or beliefs concerning among other
things, future exploration activities. The projections, estimates and beliefs contained in such
forward-looking statements don’t necessarily involve known and unknown risks, uncertainties, and
other factors, many of which are beyond the control of Adavale Resources, and which may cause
Adavale Resources actual performance in future periods to differ materially from any express or
implied estimates or projections. Nothing in this announcement is a promise or representation as
to the future. Statements or assumptions in this announcement as to future matters may prove to
be incorrect and differences may be material. Adavale Resources does not make any
representation or warranty as to the accuracy of such statements or assumptions.
Competent Persons Statement
The information in this announcement that relates to Exploration Targets, Exploration Results,
Mineral Resources or Ore Reserves is based on information compiled by Barry Willott, who is a
Member of The Australian Institute of Geoscientists (AIG) and The Australasian Institute of Mining
and Metallurgy (AusIMM). Barry Willott has sufficient experience that is relevant to the style of
mineralisation and type of deposit under consideration and to the activity being undertaken to
qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for
Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Barry Willott consents to
the inclusion in the presentation of the matters based on his information in the form and context
in which it appears.
ASX Announcement References
•
29 November 2024: Transformational Gold and Copper Project Acquisition
•
28 January 2025: Completion of Placement, Parkes Acquisition and Site Visit
The Company confirms that it is not aware of any new information or data that materially affects
the information included in the original market announcements. The Company confirms that the
form and context in which the Competent Person’s findings are presented have not been materially
modified from the original market announcement.
6
ABOUT ADAVALE RESOURCES
Exploring for Gold and Copper in the NSW Lachlan Fold Belt, Uranium in South Australia, and Nickel
Sulphide in Tanzania.
The Parkes Project
Adavale Resources Limited (ASX:ADD) holds
a 72.5% interest in the Parkes Gold and
Copper Project, consisting of four granted
exploration licences that are highly
prospective for Au-Cu, primarily due to their
location adjacent the giant Northparkes
copper-gold mine and encompassing the
Ordovician-aged rocks of the Macquarie
Arc, within the crustal-scale structure of the
Lachlan Transverse Zone (LTZ) that contain
both Northparkes and the world-class
Cadia gold-copper Mine.
South Australian Uranium Portfolio
Adavale also holds seven granted
exploration licences that are prospective
for their sedimentary uranium potential
within the northern part of the highlyprospective Northern outwash from the
Flinders Ranges in South Australia, as well
as four exploration licence east of Ceduna
on the Eyre Peninsula increasing Adavale’s
uranium tenement holdings including to
include uranium rights to 4,959km2.
The Kabanga Jirani Nickel Project
Adavale also holds the Kabanga Jirani Nickel
Project, a portfolio of twelve highly
prospective granted licences along the
Karagwe-Ankolean belt in Tanzania. The
nine southernmost licences are proximal to
the world class Kabanga Nickel Deposit
(87.6Mt @ 2.63% Ni Eq). Adavale holds 100%
of all licences except for two licences that
are known as the Luhuma-Farm-in, which
are held at 65%, adding a further 99km2 and
bringing the portfolio to 1,315km2.
Adavale’s licences were selected based on
their strong geochemical and geophysical
signatures from the previous exploration
undertaken by BHP.
7
Appendix 1 – Rock Chip Summary
Table 1: Rock chip summary (all coordinates in MGA94 / UTM Zone 55S)
Sample
RS001
RS002
RS003
RS004
RS005
RS006
P24651
P24652
P24653
P24654
Easting
609927
609847
609995
610496
610413
610538
610580
610530
610562
610597
Northing
6354086
6353774
6354018
6354192
6354061
6353906
6353888
6353931
6353926
6353834
Au (g/t)
0.006
0.005
<0.005
0.005
0.008
0.058
0.742
0.324
0.407
7.95
Cu (ppm)
73.9
73.6
80.6
98.1
107
55.6
7600
321
154
22000
Ag (g/t)
0.06
0.05
0.06
0.06
0.11
0.08
58.9
17.8
0.54
96.4
As (ppm)
4.9
6.3
5.7
5.8
6.6
6.5
458
76.3
15.4
1050
Sb (ppm)
0.39
0.53
0.75
0.78
1.52
2.16
1325
540
18.2
2460
Mo (ppm)
0.64
1.04
0.59
0.86
1.03
1
1.44
0.19
1.1
8.25
8
Appendix 2 – JORC Code, 2012 Edition – Table 1
Section 1 Sampling Techniques and Data
Criteria
JORC Code explanation
Sampling
techniques
•
•
•
•
Commentary
Nature and quality of sampling (e.g. cut channels, random chips, or specific specialised
industry standard measurement tools appropriate to the minerals under investigation,
such as downhole gamma sondes, or handheld XRF instruments, etc.). These examples
should not be taken as limiting the broad meaning of sampling.
Include reference to measures taken to ensure sample representivity and the appropriate
calibration of any measurement tools or systems used.
Aspects of the determination of mineralisation that are Material to the Public Report.
In cases where ‘industry standard’ work has been done this would be relatively simple
(e.g. ‘reverse circulation drilling was used to obtain 1 m samples from which 3 kg was
pulverised to produce a 30 g charge for fire assay’). In other cases more explanation may
be required, such as where there is coarse gold that has inherent sampling problems.
Unusual commodities or mineralisation types (e.g. submarine nodules) may warrant
disclosure of detailed information.
•
Adavale rock chip samples were selected by the geologist for gold and multi-element assay from
random chips. Typically, samples collected were between 1kg and 3kg in weight from outcrop, subcrop
and float.
Drilling
techniques
•
Drill type (e.g. core, reverse circulation, open-hole hammer, rotary air blast, auger,
Bangka, sonic, etc.) and details (e.g. core diameter, triple or standard tube, depth of
diamond tails, face-sampling bit or other type, whether core is oriented and if so, by what
method, etc.).
•
No drilling completed.
Drill sample
recovery
•
•
Method of recording and assessing core and chip sample recoveries and results assessed.
Measures taken to maximise sample recovery and ensure representative nature of the
samples.
Whether a relationship exists between sample recovery and grade and whether sample
bias may have occurred due to preferential loss/gain of fine/coarse material.
•
No drill samples have been taken.
Whether core and chip samples have been geologically and geotechnically logged to a
level of detail to support appropriate Mineral Resource estimation, mining studies and
metallurgical studies.
Whether logging is qualitative or quantitative in nature. Core (or costean, channel, etc.)
photography.
The total length and percentage of the relevant intersections logged.
•
•
No drilling completed.
Geological observations are both preliminary and qualitative. The information contained within
describes only dominant outcrop lithologies at discreet locations, and minerals of interest.
All data is stored in digital format for use in GIS software packages.
If core, whether cut or sawn and whether quarter, half or all core taken.
If non-core, whether riffled, tube sampled, rotary split, etc. and whether sampled wet or
dry.
For all sample types, the nature, quality and appropriateness of the sample preparation
technique.
•
•
•
Logging
•
•
•
Sub-sampling
techniques and
sample
preparation
•
•
•
•
Rock chip sampling only
The sample size and medium are considered appropriate for the purpose of outlining surface
geochemical anomalies.
9
Criteria
JORC Code explanation
•
•
•
Quality of assay
data and
laboratory tests
•
•
•
Verification of
sampling and
assaying
•
•
•
•
Location of data
points
•
•
•
Data spacing
and distribution
•
•
•
Commentary
Quality control procedures adopted for all sub-sampling stages to maximise
representivity of samples.
Measures taken to ensure that the sampling is representative of the in situ material
collected, including for instance results for field duplicate/second-half sampling.
Whether sample sizes are appropriate to the grain size of the material being sampled.
Rock chip samples were sent to ALS (Orange) for analysis using gold by fire assay (Method AuAA24 50g sample) and a four acid digestion followed by ICP-MS analysis (Method ME-MS61)
Sample P24654 was reassayed via a four acid digestion and ICP-AES finish (Method Cu-OG62)
To ensure industry standard Quality Control / Quality Assurance (QA/QC) 11 Standard, 5 Blanks
and 1 Repeat were inserted by ALS
The nature, quality and appropriateness of the assaying and laboratory procedures used
and whether the technique is considered partial or total.
For geophysical tools, spectrometers, handheld XRF instruments, etc., the parameters
used in determining the analysis including instrument make and model, reading times,
calibrations factors applied and their derivation, etc.
Nature of quality control procedures adopted (e.g. standards, blanks, duplicates,
external laboratory checks) and whether acceptable levels of accuracy (i.e. lack of bias)
and precision have been established.
•
The verification of significant intersections by either independent or alternative company
personnel.
The use of twinned holes.
Documentation of primary data, data entry procedures, data verification, data storage
(physical and electronic) protocols.
Discuss any adjustment to assay data.
•
Accuracy and quality of surveys used to locate drill holes (collar and down-hole surveys),
trenches, mine workings and other locations used in Mineral Resource estimation.
Specification of the grid system used.
Quality and adequacy of topographic control.
•
•
All coordinates are based on Map Grid Australia Zone 55S, Geodetic Datum of Australia 1994.
All reported locations are assumed to have a +/- 5m accuracy via use of handheld GPS instruments.
Data spacing for reporting of Exploration Results.
Whether the data spacing and distribution is sufficient to establish the degree of
geological and grade continuity appropriate for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications applied.
Whether sample compositing has been applied.
•
•
Data points are guided by field outcrops instead of a grid based spacing.
Exploration data contained within is not appropriate for calculating Mineral Resources.
Insufficient exploration has been completed at this stage to warrant such calculations. •
No compositing of results has been reported in this announcement.
•
•
•
•
•
No data verification has occurred but details and information is relayed from historical
exploration reports held by the NSW Government in their on-line DIGS system.
The Company has verified the presence of historically reported outcrop lithologies during the
reconnaissance phase of exploration works.
Field observation and sample points are guided by outcrop location at a reconnaissance stage
of on-ground exploration.
At the current stage of exploration no specific orientation of mineralisation is known and
therefore no relationship of key mineralised structures between outcrop mapping sites is
established at present.
Orientation of
data in relation
to geological
structure
•
•
Whether the orientation of sampling achieves unbiased sampling of possible structures
and the extent to which this is known, considering the deposit type.
If the relationship between the drilling orientation and the orientation of key mineralised
structures is considered to have introduced a sampling bias, this should be assessed and
reported if material.
Sample security
•
The measures taken to ensure sample security.
•
Adavale Resources and its geological consultants retained possession of all samples until they
were hand delivered to the external ALS laboratory.
Audits or reviews
•
The results of any audits or reviews of sampling techniques and data.
•
No audits or reviews have been conducted at this stage.
•
10
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria
JORC Code explanation
Mineral
tenement and
land tenure
status
•
•
Type, reference name/number, location and ownership including agreements or
material issues with third parties such as joint ventures, partnerships, overriding
royalties, native title interests, historical sites, wilderness or national park and
environmental settings.
The security of the tenure held at the time of reporting along with any known
impediments to obtaining a licence to operate in the area.
Commentary
•
•
•
•
The historic data referred to in Section 1 of this Table, and separately in Appendix 1, are located
within EL8831, part of the Parkes Project which comprises EL’s 8831, 8830, 7274 and 9711.
All tenements are subject to a JV agreement between Adavale and the tenements’ vendor,
Agricultural Equity Investments Pty Ltd (“AEI”). Adavale owns 72.5% of the tenements and is the
operator of the JV with the remaining 27.5% interest held by AEI.
EL’s 7242, 8831, 8830 and 9711 have been renewed and are in good standing, with expiry dates
on or after 12 April 2027.
Community Consultation Management Plans for all EL’s will be developed as appropriate for the
proposed exploration activity.
Exploration done
by other parties
•
Acknowledgment and appraisal of exploration by other parties.
•
Exploration of the 395km2 Parkes Project has taken place since before 1900 by parties too
numerous to mention here. In recent decades, significant exploration overlapping parts of EL’s
8831, 8830, 7274 and 9711 has been undertaken by Alkane, BHP Gold, Newcrest Mining,
AngloGold Ashanti, FMG, Geopeko, Hargraves Resources, Golden Cross Resources, Meridian
Minerals, Michelago Resources, Gold and Copper Resources and Agricultural Equity Investments.
Geology
•
Deposit type, geological setting and style of mineralisation.
•
The Parkes Project is located in the central NSW Lachlan Fold Belt at the intersection of the northwest trending, Middle Ordovician-age Lachlan Transverse Zone with the north-striking, Early
Ordovician, andesitic Junee-Narromine Volcanic Belt and adjacent Silurian sediments. This
tectono-stratigraphic setting is prospective for orogenic gold as evidenced by the Project’s
London-Victoria deposit and for porphyry-hosted copper-gold mineralisation by virtue of its
proximity to the giant Northparkes copper-gold porphyry deposit.
Drill hole
Information
•
A summary of all information material to the understanding of the exploration results
including a tabulation of the following information for all Material drill holes:
easting and northing of the drill hole collar
elevation or RL (Reduced Level – elevation above sea level in metres) of the drill
hole collar
dip and azimuth of the hole
down hole length and interception depth
hole length.
If the exclusion of this information is justified on the basis that the information is not
Material and this exclusion does not detract from the understanding of the report, the
Competent Person should clearly explain why this is the case.
•
•
No drillholes are currently reported.
Historical drillholes on the current EL8831 include 4 drillholes completed between 1983-2015 in
the vicinity of the current rock chip sampling. The Company (upon review of historical reports and
data) at this stage considers that this drilling did not adequately test the mineralised system
currently being sought. Therefore at the current exploration stage this drilling is not considered
Material.
•
11
Criteria
JORC Code explanation
Data
aggregation
methods
•
•
•
Commentary
In reporting Exploration Results, weighting averaging techniques, maximum and/or
minimum grade truncations (e.g. cutting of high grades) and cut-off grades are usually
Material and should be stated.
Where aggregate intercepts incorporate short lengths of high grade results and longer
lengths of low grade results, the procedure used for such aggregation should be stated
and some typical examples of such aggregations should be shown in detail.
The assumptions used for any reporting of metal equivalent values should be clearly
stated.
•
•
•
No data aggregation has been applied.
No resource evaluation has been undertaken.
Metal equivalent values are not reported.
These relationships are particularly important in the reporting of Exploration Results.
If the geometry of the mineralisation with respect to the drill hole angle is known, its
nature should be reported.
If it is not known and only the down hole lengths are reported, there should be a clear
statement to this effect (e.g. ‘down hole length, true width not known’).
•
•
No drilling results are reported.
Rock chip sampling only reported.
Relationship
between
mineralisation
widths and
intercept lengths
•
•
Diagrams
•
Appropriate maps and sections (with scales) and tabulations of intercepts should be
included for any significant discovery being reported These should include, but not be
limited to, a plan view of drill hole collar locations and appropriate sectional views.
•
Figures and plans are displayed in the main text of the release.
Balanced
reporting
•
Where comprehensive reporting of all Exploration Results is not practicable,
representative reporting of both low and high grades and/or widths should be
practiced to avoid misleading reporting of Exploration Results.
•
All rock chip sample sites and a summary of assay results from the current reconnaissance stage
of exploration are listed in Appendix 1.
Other
substantive
exploration data
•
Other exploration data, if meaningful and material, should be reported including (but
not limited to): geological observations; geophysical survey results; geochemical
survey results; bulk samples – size and method of treatment; metallurgical test results;
bulk density, groundwater, geotechnical and rock characteristics; potential deleterious
or contaminating substances.
•
Description of the work completed and the results are included in the historical reports of which
an overview is provided in this document.
Further work
•
The nature and scale of planned further work (e.g. tests for lateral extensions or depth
extensions or large-scale step-out drilling).
Diagrams clearly highlighting the areas of possible extensions, including the main
geological interpretations and future drilling areas, provided this information is not
commercially sensitive.
•
See planned activity in this Announcement.
•
•