Parkes Project Advances in Central NSW Lachlan Fold Belt
Released
Released
Announcement PDF
ASX ANNOUNCEMENT
9 April 2025
ASX: ADD
Parkes Project Advances in Central NSW Lachlan Fold Belt
Multi-Target Exploration Strategy Underway
• London-Victoria Gold Mine (“London-Victoria”) (EL 7242), with an Historical Estimate of 3.70Mt
@ 1.04g/t Au for 124koz gold1 is currently under review by Derisk Geomining Consultants, with
a view to converting to a JORC 2012 Mineral Resource Estimate
• Assays completed by the previous operator and vendor of the Project have now been received
• AEIDD001 which broadly targeted a depth extension of gold mineralisation at the northern
end of the London-Victoria mine has intersected an approximately 20m-thick quartzcarbonate veined pyrite-sericite(-chlorite) alteration zone from around 339m downhole that
is 150m -160m below the existing pit floor
• Best gold values were obtained in an intensely sheared portion near the base of the alteration
zone that has intersected 3m @ 0.40 g/t Au (356-359m), including 1m @ 1.02g/t Au (356-357m)
• Additional rock chip assay results recently received for the Ashes Prospect (within the Parkes
Project) returned the highest-grade gold and silver mineralisation to date:
o
10.65 g/t Au, 1.98% Cu & 158 g/t Ag (P24669)
• Assay results from the March geochemical survey at Ashes and Myalls are anticipated in April,
which follow up the recently released high-grade gold, copper and silver rock chip assay
results:
o
7.95 g/t Au, 2.2% Cu & 96.4 g/t Ag
o
0.74 g/t Au, 0.76% Cu & 58.9 g/t Ag
o
0.32 g/t Au & 17.8 g/t Ag
• Maiden drilling program to be planned during Q2 2025 following assessment of existing and
expected new target generation from geochemical survey assay results
Adavale Resources Executive Chairman and CEO, Mr Allan Ritchie, commented:
“Adavale's focus is delivering results, particularly when the gold price is trading at all time highs. The Parkes
project located in the Lachlan Fold Belt is emerging as a great opportunity for Adavale. The recent assays have
provided the Company with further geological understanding of the Parkes Project, allowing us to better target
mineralisation at the London-Victoria Gold Mine and the key Ashes and Myalls Prospects, as well as numerous
other targets across our licences.
Our engagement with Derisk Geomining is to complete a review with a view to conversion of the Historical
Resource Estimate to JORC 2012 status, at a time where gold prices have topped AU$5,000 per Oz, Adavale is
excited about the potential to exploit the Historical Estimate which is adjacent to infrastructure in a mining
friendly jurisdiction.”
1
Cautionary Statement: Readers are cautioned that the Historical Estimate for the London-Victoria deposit referred to in this Announcement is
not reported in accordance with the JORC 2012 Code. A Competent Person has not undertaken sufficient work to classify the Historical Estimate
as a Mineral Resource in accordance with the JORC 2012 Code. Nothing has come to the attention of Adavale that causes it to question the
accuracy or the reliability of the former owner’s Historical Estimate. However, Adavale has not independently validated the former owner’s
estimate and therefore is not to be regarded as reporting, adopting or endorsing the estimate. Following evaluation and further exploration work,
it is uncertain whether it will be possible to report the Historical Estimate as a Mineral Resource in accordance with the JORC 2012 Code. The
Historical Estimate has been reported in accordance with ASX Listing Rule 5.12. Refer to ASX announcement dated 29 November 2024.
Directors & Officers
Adavaleresources
ALLAN RITCHIE
NIC MATICH
Executive Chairman & CEO
Non-Executive Director
JOHN HICKS
Non-Executive Director
AdavaleL
Investors@adavaleresources.com
LEONARD MATH
CFO & Company Secretary
www.adavaleresources.com
+61 2 8003 6733
Adavale Resources Limited
Level 2, 49 Oxford Close
West Leederville, WA, 6007
\
Adavale Resources Limited (ASX:ADD) (“Adavale” or the “Company”) is pleased to provide an update
on the Parkes Project located in the prolific Lachlan Fold Belt in NSW.
Adavale has engaged Derisk Geomining Consultants (“Derisk”) to review the London-Victoria Gold Mine
Historical Estimate of 3.70Mt @ 1.04g/t Au for 124koz gold with a view to converting it to a JORC 2012
Mineral Resource Estimate.
Potentially no further drilling may be required for this conversion, making it a low-cost exercise but with
a likely tangible outcome.
Assay results from AEIDD001, which broadly targeted a depth extension of gold mineralisation at the
northern end of the London Victoria Gold Mine, have been received. AEIDD001 intersected an
approximately 20m-thick quartz-carbonate veined pyrite-sericite(-chlorite) alteration zone 150m-160m
below the existing pit floor with gold values including 1m @ 1.02g/t Au.
Follow up drilling will target shallower mineralisation closer to the open pits to allow for further
resource addition to any future JORC Mineral Resources at the Project.
Adavale received additional rock chip assay results from the March field trip to Ashes and Myalls, with
one of the samples returning the highest-grade gold assays from both prospects to date. Further rock
chip assays are currently pending from the Myalls prospect (Figure 1). Highlights include:
•
10.65 g/t Au, 1.98% Cu & 158g/t Ag (P24669)
These results complement and further confirm the previously announced rock chip results which
include2:
•
7.95 g/t Au, 2.2% Cu & 96.4 g/t Ag
•
0.74 g/t Au, 0.76% Cu & 58.9 g/t Ag
•
0.32 g/t Au & 17.8 g/t Ag
Assay results from the recently completed geochemical survey at Ashes and Myalls (two of the more
advanced Prospects at the Parkes Project) are anticipated in April. The results will be used to define
likely infill sampling leading to potential drilling targets. Upon successful delineation of these targets
the Company aims to plan a maiden drilling program at Ashes and Myalls during Q2, 2025.
Figure 1: Sample P24669 grading 10.65 g/t Au, 1.98% Cu & 158g/t Ag
2
ASX Announcement: High-Grade Gold, Copper and Silver Rock Chips at Ashes: 26 February 2025
Cautionary Statement: Readers are cautioned that the Historical Estimate for the London-Victoria deposit referred to in this Announcement is
not reported in accordance with the JORC 2012 Code. A Competent Person has not undertaken sufficient work to classify the Historical Estimate
as a Mineral Resource in accordance with the JORC 2012 Code. Nothing has come to the attention of Adavale that causes it to question the
accuracy or the reliability of the former owner’s Historical Estimate. However, Adavale has not independently validated the former owner’s
estimate and therefore is not to be regarded as reporting, adopting or endorsing the estimate. Following evaluation and further exploration work,
it is uncertain whether it will be possible to report the Historical Estimate as a Mineral Resource in accordance with the JORC 2012 Code. The
Historical Estimate has been reported in accordance with ASX Listing Rule 5.12. Refer to ASX announcement dated 29 November 2024.
2
Figure 2: Ashes Prospect - Rock Chip Assay Results Jan/March
Geological interpretation and discussion (AEIDD001)
Drillhole AEIDD001 was completed by the previous operator and Vendor of the Project, Agricultural
Equity Investments (“AEI”) prior to ADD becoming operator of the Parkes Project from late January this
year. The hole was not planned directly from a brownfields approach of targeting best gold assays close
to the existing pits, but rather as a broad step-out type exploration hole to test the overall continuity
and geology of the London-Victoria deposit at approximately 250m below surface and 150m below the
bottom of the northern end of the London zone at the London-Victoria mine (Figure 3).
3
Figure 3: Satellite image of the historic London-Victoria pit showing AEIDD001’s collar location and drillhole trace
Background to London Victoria deposit
The London Victoria Gold Mine has historically been the largest gold producer in the Parkes district and
consists of essentially four mined deposits from south to north, being the Victoria, Shaws, London and
Majors open pits (Figure 1). Open pit mining commenced in 1988 carried out by BHP Gold and later
Hargraves Resources and had ceased by 1991. Prior to this mining in the twentieth century, the historic
London-Victoria line of lode was firstly delineated in 1873 by the discovery of the Victoria deposit in
1873 which was worked from 1876, while the London mine was worked from around 1877 to 1909. It
is reported that 155kg of gold was produced at the site prior to 1988.
Geological details obtained from open pit mining reveal that the three highest grade areas, i.e., the
London, Shaws and Victoria zones are separated by lower grade zones and that the mined ore bodies
were typically poddy as evidenced by the existence of four separate pits. Pervasive shearing is
ubiquitous with steeply dipping gold mineralised quartz veins reported as located within plunging
zones. Overall, gold mineralisation in the London-Victoria deposit is hosted by an anastomosing shear
zone that is highly variable, with the mineralised zone reported to be up to 35m wide in the London
zone and individual gold mineralised lenses seen to be overlapping, extending for up to 100m along
strike and down dip, and up to 10m wide. These lenses are contained within a sericite-carbonate
(including ankerite)-pyrite-quartz alteration zone that is up to 100m wide and 3km long, found east of
and adjacent to the north-south striking and steeply dipping London-Victoria Fault. At present the
historical London-Victoria gold mine in EL 7242 has an Historical Estimate (Appendix 1).
4
November 2024 Diamond Drilling and Assay Results
An angled 453m-long diamond core hole (AEIDD001) was drilled by the Vendor in November 2024 to
test the down-dip depth potential of the London-Victoria gold deposit. The hole targeted the deposit
approximately 250m below surface and 150m below the bottom of the London zone pit.
AEIDD001 was drilled –55o towards the west with an anticipated target depth of 340m downhole. The
hole has intersected a prospective 20m-wide zone of quartz-carbonate veining and shearing within
pyrite-sericite altered andesitic volcaniclastic rock from around 339m to 359m downhole. Enclosed
within this alteration package, towards the base, an intensely sheared, quartz veined chloritic/sericitic
zone with pyrite is located between 356.70-358.20m downhole (Figure 4). The wider intercept (339359m) is broadly consistent with the geology, thickness, structure and alteration assemblage, exhibited
by the ore that was mined at the bottom of the London-Victoria pit by BHP Gold and Hargraves
Resources in the 1980s and 1990s.
Sampling of the drill core was initially delayed for various reasons and then the highest priority drill
core covering the anticipated main mineralised zone (336-416m) was sampled and sent to the ALS
laboratory by Rangott Mineral Exploration Services (RME), just prior to the 2024-2025 Christmas-New
Year period. Also, early in 2025 it was decided on further inspection of the drill core by Adavale to carry
out some additional, lesser priority sampling of variably silicified and altered, mostly volcaniclastic rocks
intersected higher up the hole (62-80m; 106-168m). Further delays in receiving assay results over the
Christmas-New Year period and afterwards were experienced. It was then decided by Adavale that all
gold and multi-element assay results from both submittals should be received to allow for a more
definitive geological interpretation relating assays to quartz-carbonate veins and the logged enclosing
alteration assemblage(s) intersected in AEIDD001.
Figure 4: Photo of core trays 109 and 110 from DDH AEIDD001(351.83-358.20m) showing the lower portion of the 20m-thick zone of
quartz-carbonate veining in sericite-pyrite altered andesitic volcaniclastic rocks intersected 339-359m downhole and interpreted as
representative as the down-dip extension to the London zone at the London-Victoria deposit
5
Assay results from a total of 157 core samples (1 metre length) have now been received from ALS and
the results assessed. The intensely sheared 2.2m wide zone near the base of the logged main alteration
zone has returned assay results preliminarily interpreted at depth, as representative of the London
zone at London-Victoria mine, but recording subdued gold values of 1m @ 1.02g/t Au (356-357m) and
1m @ 0.17g/t Au (358-359m) downhole. Also noted from the multi-element data within the 3m zone
tabulated below are weakly anomalous molybdenum, tellurium and tungsten with peak values within
this zone of 7.22ppm Mo, 0.29ppm Te and 10.4ppm W.
Table 1: Summary of Best Assays - AEIDD001
Hole
AEIDD001
AEIDD001
AEIDD001
From
356
357
358
To
357
358
359
Interval (m)
1
1
1
Au (g/t)
1.020
0.013
0.173
Ag (ppm)
0.49
0.27
0.32
Cu (ppm)
50
100
50
The recent assay results obtained from completing AEIDD001 is the first exploration drilling to be
carried out at the London-Victoria mine since 1990. Whilst these results from the 20m wide quartzcarbonate veined alteration zone are not particularly substantial, they show to some degree that similar
geology and the main alteration zone persists at depths of up to 150-160 beneath the London open pit.
In addition, the relatively narrow gold mineralised shear zone intersected between 356.70-358.20m in
AEIDD001 at this stage (from very limited data), is interpreted as representative of at least some
continuity of the London-Victoria mineralised structure at depth, albeit well below the previously mined
London pit.
It should also be noted that the high-grade portion of an anastomosing and poddy style of gold
mineralisation known from historical drilling and previous mining activity at London-Victoria could
easily be missed in a single drillhole test. The completed drillhole, AEIDD001 has targeted considerably
deeper than the bottom of the overlying pit and significantly distant from the closest known
mineralisation intersected in any previous drilling. It is therefore considered by Adavale that this
drillhole which has been completed by the Vendor has been highly speculative, but nevertheless still
partly successful in intersecting the target gold mineralised zone.
The incentive now for Adavale will be to absorb the geological information that drilling AEIDD001
provides and move onto further drilling to add additional resource ounces to the current Historical
Estimate. This estimate is currently under review by independent resource geology consultancy, Derisk
Geomining Consultants with a view to soon upgrading the Historical Estimate to a JORC 2012 Mineral
Resource.
Also, in the immediate future, it is envisaged that drilling will be planned much closer to the open pits
for further resource addition and in consideration of the likely much better known controls on gold
mineralisation stemming from the current review. Adavale intends to adopt an incremental approach
by revisiting and targeting the structurally controlled gold mineralisation at London-Victoria and by
examining the best results obtained from previous drilling and mining activity. This will allow for a
greater understanding to be achieved prior to undertaking any further, deeper step-out drilling at the
London-Victoria mine.
6
Adavale’s Parkes Project
Figure 5: Map of the central New South Wales Lachlan Fold Belt
The Parkes Project comprises four exploration tenements for a total area of 354.15km2, within the
prolific gold and copper-producing Macquarie Arc portion of the Lachlan Fold Belt (NSW). These are
prospective for orogenic, epithermal and gold-rich porphyry-style copper-gold deposits.
The exploration licences are situated where Early Ordovician-aged Junee-Narromine Volcanic Belt rocks
of the western part of the Arc are intersected by the crustal-scale structural corridor of the Lachlan
Transverse Zone (“LTZ”). Significantly, the LTZ is host to Tier-1 gold and copper mines, such as
Northparkes (5.2Moz Au & 4.4Mt Cu) and Cadia Ridgeway (35.1Moz Au & 7.9Mt Cu) where it intersects
Macquarie Arc rocks (Figure 5).
The Parkes Project’s most advanced prospect is the former London-Victoria Gold Mine which saw
estimated historical production by BHP Gold and Hargraves Resources of 200,000 to 250,000 ounces at
a head grade of 1.5-2g/t Au. A non-JORC Historical Estimate of 3.7Mt at 1.04 g/t Au for 123.8koz Au is
defined for London-Victoria (refer to Cautionary Statement below).
At London-Victoria, it is intended to utilise the existing drillhole database with minimal additional
resource definition work to estimate a JORC Mineral Resource in the near future. This opportunity
comes at relatively low cost and at a time of record gold prices.
Cautionary Statement: Readers are cautioned that the Historical Estimate for the London-Victoria deposit referred to in this
Announcement is not reported in accordance with the JORC 2012 Code. A Competent Person has not undertaken sufficient work to classify
the Historical Estimate as a Mineral Resource in accordance with the JORC 2012 Code. Nothing has come to the attention of Adavale that
causes it to question the accuracy or the reliability of the former owner’s Historical Estimate. However, Adavale has not independently
validated the former owner’s estimate and therefore is not to be regarded as reporting, adopting or endorsing the estimate. Following
evaluation and further exploration work, it is uncertain whether it will be possible to report the Historical Estimate as a Mineral Resource
in accordance with the JORC 2012 Code. The Historical Estimate has been reported in accordance with ASX Listing Rule 5.12. Refer to ASX
announcement dated 29 November 2024 further information.
7
This announcement is authorised for release by the Board of Adavale Resources Limited.
Further information:
Allan Ritchie
Executive Chairman and CEO
Adavale Resources
E: investor@adavaleresources.com
P: +61 2 8003 6733
Jane Morgan
Media and Investor Inquiries
Jane Morgan Management
E: jm@janemorganmanagement.com.au
P: +61(0) 405 555 618
Forward Looking Statements
Certain statements in this announcement are or may be “forward-looking statements” and
represent Adavale’s intentions, projections, expectations, or beliefs concerning among other
things, future exploration activities. The projections, estimates and beliefs contained in such
forward-looking statements don’t necessarily involve known and unknown risks, uncertainties, and
other factors, many of which are beyond the control of Adavale Resources, and which may cause
Adavale Resources actual performance in future periods to differ materially from any express or
implied estimates or projections. Nothing in this announcement is a promise or representation as
to the future. Statements or assumptions in this announcement as to future matters may prove to
be incorrect and differences may be material. Adavale Resources does not make any
representation or warranty as to the accuracy of such statements or assumptions.
Competent Persons Statement
The information in this announcement that relates to Exploration Targets, Exploration Results,
Mineral Resources or Ore Reserves is based on information compiled by Barry Willott, who is
employed by Desdinova Metals Pty Ltd as consultant to Adavale Resources Ltd. Mr Willott is a
Member of The Australian Institute of Geoscientists (AIG) and The Australasian Institute of Mining
and Metallurgy (AusIMM). Mr Willott has sufficient experience that is relevant to the style of
mineralisation and type of deposit under consideration and to the activity being undertaken to
qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for
Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Willott consents to the
inclusion in the presentation of the matters based on his information in the form and context in
which it appears.
ASX Announcement References
•
29 November 2024: Transformational Gold and Copper Project Acquisition
•
28 January 2025: Completion of Placement, Parkes Acquisition and Site Visit
•
26 February 2025: High-Grade Gold, Copper and Silver Rock Chips at Ashes
•
3 March 2025: Geochemical Survey Commences at Ashes & Myalls Prospects
•
24 March 2025: Completion of Geochemical Survey at Ashes and Myalls
The Company confirms that it is not aware of any new information or data that materially affects
the information included in the original market announcements. The Company confirms that the
form and context in which the Competent Person’s findings are presented have not been materially
modified from the original market announcement.
8
ABOUT ADAVALE RESOURCES
Exploring for Gold and Copper in the NSW Lachlan Fold Belt, Uranium in South Australia, and Nickel
Sulphide in Tanzania.
The Parkes Project
Adavale Resources Limited (ASX:ADD) holds
a 72.5% interest in the Parkes Gold and
Copper Project, consisting of four granted
exploration licences that are highly
prospective for Au-Cu, primarily due to their
location adjacent the giant Northparkes
copper-gold mine and encompassing the
Ordovician-aged rocks of the Macquarie
Arc, within the crustal-scale structure of the
Lachlan Transverse Zone (LTZ) that contain
both Northparkes and the world-class
Cadia gold-copper Mine.
South Australian Uranium Portfolio
Adavale also holds seven granted
exploration licences that are prospective
for their sedimentary uranium potential
within the northern part of the highlyprospective Northern outwash from the
Flinders Ranges in South Australia, as well
as four exploration licence east of Ceduna
on the Eyre Peninsula increasing Adavale’s
uranium tenement holdings including to
include uranium rights to 4,959km2.
The Kabanga Jirani Nickel Project
Adavale also holds the Kabanga Jirani Nickel
Project, a portfolio of twelve highly
prospective granted licences along the
Karagwe-Ankolean belt in Tanzania. The
nine southernmost licences are proximal to
the world class Kabanga Nickel Deposit
(87.6Mt @ 2.63% Ni Eq). Adavale holds 100%
of all licences except for two licences that
are known as the Luhuma-Farm-in, which
are held at 65%, adding a further 99km2 and
bringing the portfolio to 1,315km2.
Adavale’s licences were selected based on
their strong geochemical and geophysical
signatures from the previous exploration
undertaken by BHP.
9
APPENDIX 1
Schedule 1 - Details of Historical Estimate in relation to ASX LR Chapter 5.
Sections 5.10 to 5.12. Requirements applicable to reports of historical estimates and foreign estimates of
mineralisation for material mining projects.
ASX Listing Rule 5.10 - An entity reporting historical estimates or foreign estimates of mineralisation in
relation to a material mining project to the public is not required to comply with rule 5.6 (The JORC Code)
provided the entity complies with rules 5.12, 5.13 and 5.14.
For the non-JORC Historical Estimate included in this market release, Adavale is not required to comply with
Listing Rule 5.6 (JORC Code) as all relevant and requested disclosures are stated in the report and tabulated
below. The Company complies with 5.12, 5.13 and 5.14 requirements for statement of non-JORC historical
resource estimates, as tabled below.
Listing Rule 5.11 - An entity must not include historical estimates or foreign estimates (other than
qualifying foreign estimates) of mineralisation in an economic analysis (including a scoping study,
preliminary feasibility study, or a feasibility study) of the entity’s mineral resources and ore reserves
holdings.
Adavale is not applying any economic analysis or commentary to the Historical Estimate referred to in this market
release at present.
Listing Rule 5.12 - Subject to rule 5.13 an entity reporting historical estimates or foreign estimates of
mineralisation in relation to a material mining project must include all of the following information in a
market announcement and give it to ASX for release to the market.
Listing Rule 5.12 sets out the parameters whereby Historical Estimates can be reported on the ASX. Accordingly,
in addition to the disclosure in the body of this announcement, Adavale provides the following information regarding
the Historical Estimate for the London-Victoria deposit.
5.12.1 – The source and date of the Historical Estimate of mineralisation.
The Historical Estimate of 3.70Mt at 1.04 g/t Au for 124k oz Au (‘London-Victoria Historical Estimate’) is contained
in the report titled: ‘Agricultural Equity Investments Pty Limited, Exploration Licence 7242, “Parkes”, Third Annual
Exploration Progress Report, for the period 7th November 2010 – 6th November 2011”. This, and related, reports
can be found in the Geoscience NSW public database (DIGS) as report RE0002336 (GS2012/0015). The
Company estimates that 100% of this estimate is located within the properties it controls.
5.12.2– Whether the historical resource estimates of mineralisation use categories of mineralisation
other than those defined in JORC Code 2012 and if so, an explanation of the differences.
The London Victoria Historical Estimate uses Indicated, Inferred and Total categories of mineralisation; the same
as those defined under the JORC Code 2012.
ASX Listing Rule 5.12.3 – The relevance and materiality of the Historical Estimates of mineralisation to the
entity.
The London-Victoria historical Estimate is considered by Adavale to be relevant and of significant materiality to an
assessment of the value of the Parkes Gold and Copper Project as it provides an indication of scale and grade as
well as a level of context and background for the potential development of the Project.
10
ASX Listing Rule 5.12.4 – The reliability of the Historical Estimate of mineralisation, including reference to
any criteria in Table 1 of JORC Code 2012 which are relevant to understanding of the reliability of the
Historical Estimate.
It is the opinion of Adavale that the 2011 Historical Estimate, which was made using Datamine software by an
experienced consultant geologist and peer reviewed by a mining engineer and a second geologist, is reliable and
represents the results of work done to reasonable standards.
Regarding the specific criteria in JORC Table 1 – namely Sampling Techniques and Data, Reporting of Exploration
Results, and Estimation and Reporting of Mineral Resources – all relevant and available information obtained so far
is contained in the Agricultural Equity Investments Annual Report referenced above.
Appendix 3 of this report contains further information with reference to the criteria in Sections 1, 2, and 3 of Table
1 of the JORC Code, to the extent considered relevant to understanding the reliability of the Historical Estimate
referred to in this announcement.
ASX Listing Rule 5.12.5 – To the extent known, a summary of the work programs on which the Historical
Estimates of mineralisation is based and a summary of the key assumptions, mining and processing
parameters and methods used to prepare historical resource estimates of mineralisation.
All relevant and available information is contained in the Agricultural Equity Investments Annual Report referenced
above.
In summary, the London-Victoria area has been extensively explored and drilled, prior to, during and after open- pit
mining (1988-1995) by previous owners Alkane Resources, BHP Gold, Newcrest Mining and Hargraves
Resources. Information for the Historical Estimate model was collated by these owners, as well as subsequent
owners Michelago Resources / Sipa Resources, Golden Cross Resources and Agricultural Equity Investments.
The historical pit shape has an NNE strike of 1.6km and a width of up to 170m, with depth to 150m; the resource is
focused on remnant material in the pit walls and floor to an additional depth of approximately 100m.
The Historical Estimate was based on a database of more than 1000 drill holes (RAB, RC and DC), exceeding
35km of drilling. It is reported using a cutoff grade of 0.5g/t Au. Grade interpolation was performed using Ordinary
Kriging into 12.5x4x5m parent cells.
ASX Listing Rule 5.12.6 – Any more recent estimates or data relevant to the reported mineralisation
available to the entity.
Adavale is not aware of any more recent estimates or data relevant to the London-Victoria property.
ASX Listing Rule 5.12.7 – The evaluation and/or exploration work that needs to be completed to verify the
Historical Estimate of mineralisation as a Mineral Resources or Ore Reserves in accordance with the JORC
Code 2012.
Adavale has commenced a program of evaluation work that includes verification of historical drillhole data and
other geological work. Further resource definition drilling will also be completed by Adavale to support a JORC
2012 Mineral Resource estimate for the London-Victoria deposit. Prior to estimating a Mineral Resource, the
Company will undertake its own resource evaluation work as required under the 2012 JORC Code which will
include site visits, geological interpretation, data assimilation, new estimation and modelling techniques,
assessment of relevant environmental factors and assumptions regarding mining methods, processing and
potential dilution.
ASX Listing Rule 5.12.8 – The proposed timing of any evaluation and/or exploration work that the entity
intends to undertake and a comment on how the entity intends to fund that work.
The Company will complete resource definition work following the completion of a data review and after acquiring
any required permits. It is working towards conducting an initial drilling program in 2025. The drilling will be funded
through the capital raising as announced and potential future raisings.
11
Appendix 2 – Rock Chip Summary
Table 1: Rock chip summary (all coordinates in MGA94 / UTM Zone 55S)
Sample
RS001
RS002
RS003
RS004
RS005
RS006
RS001
P24651
P24652
P24653
P24654
Easting
609927
609847
609995
610496
610413
610538
609927
610580
610530
61056
Share your feedback
Discover